Skip to content

Coiled Tubing Applications for Drilling and Logging Training Course

Choose where coil drills, logs, lifts and stimulates, with reach and fatigue checks, for intervention and completion engineers and field supervisors.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 30 November – 4 December 2026 in Dar es Salaam. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Dar es Salaam
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

August 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Coiled Tubing Applications for Drilling and Logging is a 1-week training course for well intervention engineers, completion engineers and field supervisors who must decide when a continuous string beats jointed pipe, and it ends with a coiled tubing application selection matrix for their own wells. Mature fields, slim re-entries and tighter rig budgets make that choice more frequent and more costly to get wrong. Jupiter Prime Training delivers this course on coiled tubing applications.

Why Coiled Tubing Applications Matter Now

Three forces push coiled tubing beyond routine cleanouts. Operators re-enter old wellbores to reach bypassed reserves without a rig. Longer laterals need logging conveyance that wireline cannot provide. Gas wells loading with liquid need velocity strings and nitrogen kickoff rather than costly workovers. Matching string and bottomhole assembly to each job saves rig days and protects the well; guessing risks buckled pipe and fatigue failures. The course rests on recognised industry recommended practices for coiled tubing operations, described in general terms.

Who Gains Most from Coiled Tubing Applications

  • Engineers who design intervention and re-entry jobs and choose the conveyance method for each well
  • Completion specialists who plan velocity strings, hang-offs and coil-conveyed completion hardware
  • Field supervisors who run the injector, the pressure control stack and the crew at the wellsite
  • Petrophysical and production staff who request logging runs in deviated and horizontal wells
  • Asset engineers who weigh coil options against rig workovers when ranking well candidates

Asset teams sending an engineer, a completion specialist and a supervisor together gain most.

Coiled Tubing Applications Capabilities

Participants leave able to judge where a continuous string fits, how far it can reach and how long it will last.

  • Assess well candidates for coil drilling, logging or velocity strings — the asset's intervention ranking
  • Calculate reach and lock-up depth with tubing forces modelling — the job feasibility decision
  • Specify string size, wall taper and grade for each application — procurement and string allocation
  • Apply fatigue tracking to retire or redeploy a reel — the equipment owner
  • Design nitrogen lift and stimulation sequences on coil — the production engineer
  • Communicate pressure control and contingency limits — the wellsite supervisor and crew

Key Coiled Tubing Applications Terms

  • Lock-up — the depth at which helical buckling and wall friction stop the string from advancing further into a lateral.
  • Fatigue life — the share of a reel's working cycles already used by bending under pressure.
  • Coiled tubing drilling — drilling or sidetracking with a downhole motor run on a continuous string.
  • Velocity string — a smaller string hung inside production tubing to raise gas velocity and lift liquids that load the well.
  • Tubing forces model — a calculation of load, buckling and friction that predicts reach.
  • Coil-conveyed logging — running logging tools on coil where wireline cannot reach.

Coiled Tubing Applications Day by Day

Day 1: The Continuous String and Its Equipment

  • Injector Head, Gooseneck and Reel Layout — Matching Surface Spread to Wellsite Space
  • Pressure Control Stack and Stripper Elements — Setting Barrier Philosophy for Live Wells
  • String Grades, Wall Taper and Diameter — Choosing Pipe for Load and Reach
  • Bending Fatigue and Reel Cycle Tracking — Deciding When to Cut or Retire Pipe
  • Coil Versus Jointed Pipe Comparison — Selecting Conveyance by Cost and Risk

Day 2: Reach, Forces and Pipe Limits

  • Tubing Forces Modelling and Helical Buckling — Predicting Lock-Up in Long Laterals
  • Friction Reducers and Agitator Tools — Extending Reach Beyond Modelled Lock-Up
  • Collapse, Burst and Ovality Limits — Defining Safe Working Envelopes for Each Run
  • Hydraulics and Pump Rate Calculations — Balancing Circulation Against Downhole Pressure
  • Bottomhole Assembly Components and Disconnects — Planning Release Options Before Tripping In

Day 3: Drilling and Sidetracking on Coil

  • Through-Tubing Re-Entry and Whipstock Setting — Reaching Bypassed Reserves Without a Rig
  • Downhole Motors and Orienting Tools — Steering Small-Hole Trajectories Accurately
  • Underbalanced Drilling with Nitrogen — Protecting Sensitive Reservoirs During Drilling
  • Hole Cleaning in Small Annuli — Preventing Cuttings Beds and Stuck Pipe
  • Cleanouts and Fill Removal Sequences — Restoring Access Ahead of New Laterals

Day 4: Logging, Lifting and Stimulation

  • Memory and Real-Time Logging Conveyance — Acquiring Data in Horizontal Sections
  • Fibre-Optic Enabled Coil Strings — Monitoring Stimulation and Flow Profiles Live
  • Nitrogen Kickoff and Unloading — Returning Dead Wells to Natural Flow
  • Acid Placement and Diversion on Coil — Targeting Zones Across Long Intervals
  • Velocity String Design and Hang-Off — Extending Gas Well Producing Life

Day 5: Practising the Application Selection Matrix

  • Candidate Screening From Well Files — Ranking Wells for Coil Work
  • Reach and Fatigue Checks on Real Trajectories — Confirming Feasibility Before Mobilisation
  • Contingency and Stuck Pipe Planning — Preparing Responses for Each Failure Mode
  • Job Plan Peer Challenge — Testing Assumptions Across Disciplines
  • Coiled Tubing Application Selection Matrix — Completing the Asset Decision Tool

Applying Coiled Tubing Applications After the Course

  • Model tubing forces on the three longest laterals and record where lock-up limits logging runs.
  • Audit fatigue records of every reel and flag strings needing a cut before the next job.

Coiled Tubing Applications Questions (FAQ)

What are coiled tubing applications for drilling and logging, and why do they matter now?

They are the uses of a continuous steel string to drill, sidetrack, log, lift and stimulate wells without a rig. They matter now because mature fields need low-cost re-entries.

Which roles gain most from coiled tubing applications training?

Intervention, completion and production engineers gain most, together with the field supervisors who run the unit.

How does coiled tubing applications training differ from a coiled tubing intervention operations course?

It looks at where coil fits rather than how to run routine cleanouts. You spend most time on drilling, sidetracking, coil-conveyed logging and velocity strings, and on reach and fatigue checks.

What do you bring back from coiled tubing applications training?

You bring back a selection matrix that ranks your wells by coil application, with reach and fatigue checks attached.

Coiled Tubing Applications: The Way Forward

The coiled tubing application selection matrix first informs which wells move into the next intervention schedule and which still need a rig. Asset engineers use it to rank candidates, and supervisors use its limits to brief crews. After its first use, revisit the fatigue and reach assumptions against actual job data, since real lock-up depths often differ from the model.

Questions about dates, fees and booking

When does this course next run?

The next session runs 30 November – 4 December 2026 in Dar es Salaam. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Dar es Salaam, Geneva, Istanbul, Vienna, Manama, Sharm El-Sheikh, Singapore, Milan, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 10 – 14 October 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train