Skip to content

Cold and Dark Power Plant Decommissioning Training Course

Take a retiring gas or oil fired unit to a verified zero-energy state, from isolation and purging to permits and handover.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 22 – 26 November 2026 in Sharm El-Sheikh. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Sharm El-Sheikh
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

August 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Cold and Dark Power Plant Decommissioning is a 1-week training course for plant managers, decommissioning engineers and asset owners, built around a cold and dark isolation and handover plan for a retiring gas or oil fired generating unit. As ageing thermal fleets give way to newer capacity, owners must make retired units permanently safe, clean and ready for reuse or demolition. Jupiter Prime Training delivers this course on cold and dark power plant decommissioning.

Why Cold and Dark Power Plant Decommissioning Matters Now

Three forces shape thermal unit retirement today: portfolios shifting to lower-carbon capacity, insurers and lenders seeking proof that stranded assets carry no residual hazard, and fewer staff who know each unit's history. An owner who reaches a verified cold and dark state limits fire, explosion and environmental exposure and protects the site's redevelopment value. The course rests on recognised energy isolation, permit to work and hazardous waste practice described in general terms.

Who Gains Most from Cold and Dark Power Plant Decommissioning

  • Leaders accountable for the retirement decision and the residual liability of the site
  • Engineers who define isolation boundaries for fuel, steam, electrical and chemical systems
  • Operations supervisors who run the final shutdown, draining and purging of the unit
  • Specialists who handle asbestos, residual oil and chemical inventories
  • Planners who sequence dismantling contractors

Owner teams sending operations, engineering and environmental leads together gain most, since all three must agree the isolation boundary.

Cold and Dark Power Plant Decommissioning Capabilities

Participants leave able to take a fired unit from its last megawatt to a verified zero-energy site.

  • Specify isolation boundaries for fuel gas, fuel oil, steam and electrical systems — asset owners and permit authorities
  • Design a draining, purging and inerting sequence for tanks, pipework and boilers — operations supervisors
  • Assess hazardous material inventories and removal routes — environmental leads and waste contractors
  • Build a permit and lock-out regime suited to a non-operating site — dismantling contractors
  • Weigh preservation, mothballing and demolition options for each system — finance and portfolio leaders
  • Communicate verified zero-energy status and residual risk at handover — insurers and lenders

Key Cold and Dark Power Plant Decommissioning Terms

  • Cold and dark state — a condition in which a plant holds no stored fuel, pressure, heat or live electrical supply.
  • Positive isolation — physical separation of a system with blinds or removed spool pieces, not closed valves alone.
  • Purging — displacing flammable gas from equipment with inert gas until readings confirm a safe atmosphere.
  • Mothballing — preserving equipment in a protected, non-operating condition for later restart or sale.
  • Zero-energy verification — the test and witness step proving every energy source is removed or secured before work begins.
  • Residual inventory — fuel, chemicals and sludge left in a plant after final shutdown.

Cold and Dark Power Plant Decommissioning Day by Day

Day 1: Retirement Context and Asset Baseline

  • Unit Retirement Drivers — Timing Of Final Shutdown And Grid Release
  • As-Built Records And Line Lists — Gaps In The Asset Baseline
  • Stakeholder Map For Retirement — Roles Of Owner, Operator And Contractor
  • End-State Options Matrix — Mothball, Preserve, Sell Or Demolish
  • Residual Liability Register — Exposures The Owner Keeps After Closure

Day 2: Energy Isolation and De-Energisation

  • Electrical De-Energisation Sequence — Disconnection From Switchyard And Auxiliaries
  • Fuel Gas And Fuel Oil Isolation — Positive Blinding Versus Valve Isolation
  • Steam, Water And Compressed Air Isolation — Stored Pressure And Thermal Energy
  • Lock-Out Tag-Out For A Non-Operating Site — Long-Duration Isolation Control
  • Isolation Boundary Drawings — Single Source Of Truth For Contractors

Day 3: Draining, Purging and Hazardous Inventories

  • Tank And Pipework Draining Plan — Recovery Of Residual Fuel Oil
  • Nitrogen Purging And Gas Testing — Release Criteria For Hot Work
  • Boiler And Heat Recovery Unit Layup — Corrosion During Long Standby
  • Asbestos, Insulation And Chemical Surveys — Removal Sequencing And Disposal Routes
  • Transformer Oil And Battery Removal — Fire Load And Spill Exposure

Day 4: Permits, Dismantling Sequence and Handover Evidence

  • Permit To Work For Dismantling — Authority Transfer To Demolition Contractors
  • Demolition Sequencing And Exclusion Zones — Structural Stability Of Stacks And Turbine Halls
  • Salvage And Equipment Resale Screening — Recovery Value Versus Removal Cost
  • Site Contamination Assessment — Remediation Scope Before Land Reuse
  • Handover Dossier Contents — Evidence Insurers And Future Users Expect

Day 5: Practising the Cold and Dark Isolation and Handover Plan

  • Applying The End-State Options Matrix — Choosing A Path For Each System
  • Applying Isolation Boundary Drawings — Testing A Gas Turbine Case
  • Applying The Purging And Draining Plan — Walkdown Of An Oil-Fired Boiler
  • Zero-Energy Verification Walkdown — Witness Points And Sign-Off Roles
  • Cold And Dark Isolation And Handover Plan — Completed For A Retiring Unit

Applying Cold and Dark Power Plant Decommissioning After the Course

  • Lead a walkdown of a retiring unit to mark up isolation boundary drawings.
  • Complete the residual inventory and removal sequence with environmental and operations leads.

Cold and Dark Power Plant Decommissioning Questions (FAQ)

What is cold and dark power plant decommissioning and why does it matter now?

It is the process of removing every source of fuel, pressure, heat and electricity from a retired generating unit. It matters now because many gas and oil fired units are retiring and need safe, documented end states.

Which roles gain most from cold and dark power plant decommissioning training?

Plant managers, decommissioning engineers, operations supervisors, environmental specialists and asset owners gain most. You benefit if you sign off isolations or answer for residual site liability.

How does cold and dark power plant decommissioning differ from offshore platform decommissioning?

It focuses on onshore thermal generating units: turbines, boilers, switchyards and fuel systems. Offshore courses centre on well plugging, topsides removal and subsea structures.

What do you bring back from cold and dark power plant decommissioning training?

You bring back a drafted isolation and handover plan for a real or model unit, with boundary drawings, a purging sequence and a handover evidence list.

Cold and Dark Power Plant Decommissioning: The Way Forward

The cold and dark isolation and handover plan first informs the decision on each system's end state: preserve, sell or demolish. Operations supervisors and contractors rely on it when permits change hands. After first use, revisit how residual liability is tracked for insurers and future site users.

Questions about dates, fees and booking

When does this course next run?

The next session runs 22 – 26 November 2026 in Sharm El-Sheikh. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Sharm El-Sheikh, Abu Dhabi, Vienna, Dar es Salaam, Manama, London, Geneva, Amsterdam, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 31 January – 4 February 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train