Skip to content

Mechanical Integrity and Safety-Critical Equipment Training Course

Supervisors and planners learn to keep relief valves, interlocks and pressure equipment verified, deferrals controlled and changes reviewed.

This 1-week course has 25 dates from December 2026 to November 2027 in 24 cities and live online. The next session runs 27 – 31 December 2026 in Dubai. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Dubai
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

August 2027

September 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Mechanical Integrity and Safety-Critical Equipment is a 1-week training course for operations and maintenance supervisors who keep hazardous plant running, and it produces a Safety-Critical Element Maintenance Plan for each participant's unit. Ageing equipment, tighter turnaround windows and leaner crews mean that a missed inspection or an unchecked modification can escalate into a loss of containment. Jupiter Prime Training delivers this course on Mechanical Integrity and Safety-Critical Equipment.

Why Mechanical Integrity and Safety-Critical Equipment Matters Now

Three forces shape this subject today: ageing assets operating beyond their original design life, contractors performing a growing share of hands-on repairs, and insurers and boards asking for evidence that protective barriers actually work. A site that keeps its relief valves, interlocks and pressure envelopes in verified condition avoids unplanned releases and costly shutdowns; a site that lets barrier upkeep drift accumulates hidden risk. The course rests on the risk-based process safety approach, the bow-tie barrier model and the layers of protection concept.

Who Gains Most from Mechanical Integrity and Safety-Critical Equipment

  • Supervisors who release equipment for repair and sign it back into service
  • Planners who schedule inspection, testing and preventive tasks on protective devices
  • Shift leads who approve temporary bypasses and operating deviations
  • Reliability staff who track failures of relief, isolation and shutdown equipment
  • Contractor coordinators who brief external crews before hazardous work

Mixed operations and maintenance groups from one unit gain most, since barrier failures often begin at their handover.

Mechanical Integrity and Safety-Critical Equipment Capabilities

Participants leave able to connect each wrench-time decision to the barrier it protects and the hazard it holds back.

  • Identify safety-critical elements on a unit and link each to a major accident hazard — area authority and asset owner
  • Specify inspection, test and preventive maintenance tasks with performance standards — maintenance planner
  • Assess equipment deficiencies and decide on deferral, mitigation or shutdown — operations supervisor
  • Apply management of change to like-for-like replacements and temporary repairs — technical authority
  • Control permits, isolations and bypasses during intrusive work — shift lead and contractor crews
  • Build leading indicators of barrier health for routine reporting — site leadership

Key Mechanical Integrity and Safety-Critical Equipment Terms

  • Mechanical integrity — the condition in which pressure equipment, piping and protective devices remain fit to contain process fluids throughout service.
  • Safety-critical element — any equipment item whose failure could cause or fail to limit a major accident hazard.
  • Performance standard — a written statement of what a barrier must do, how reliably, and how its condition is verified.
  • Management of change — the formal review of any modification, including temporary repairs, before it alters plant risk.
  • Deferred maintenance — a planned task postponed past its due date, requiring risk assessment and interim measures.
  • Barrier impairment — a state in which a protective layer is degraded, bypassed or out of service.

Mechanical Integrity and Safety-Critical Equipment Day by Day

Day 1: Hazards Behind the Maintenance Work Order

  • Major Accident Hazard Screening — Which Units Carry Catastrophic Potential
  • Bow-Tie Diagrams — Linking Threats, Barriers and Consequences
  • Lessons From Refinery and Chemical Plant Releases — Recurring Maintenance Causes
  • Elements of Process Safety Management — Where Maintenance Owns Delivery
  • Process Safety Information — Drawings and Data Technicians Must Trust

Day 2: Mechanical Integrity of Pressure Equipment

  • Safety-Critical Element Lists — Selecting Equipment That Needs Assurance
  • Performance Standards — Defining Function, Reliability and Survivability
  • Risk-Based Inspection Intervals — Matching Effort to Damage Mechanisms
  • Relief Valve Testing Routines — Pop Tests, Overhaul and Records
  • Integrity Operating Windows — Limits That Trigger Maintenance Response

Day 3: Protective Systems and Barrier Upkeep

  • Safety Instrumented Function Proof Testing — Coverage and Test Frequency
  • Bypass and Override Control — Authorising and Tracking Impairments
  • Fire and Gas Detection Upkeep — Calibration and Response Checks
  • Emergency Shutdown Valve Stroke Tests — Closure Time Acceptance
  • Deficiency Reporting — Deferral, Interim Measures or Unit Shutdown

Day 4: Change, Permits and Safe Intrusive Work

  • Management of Change Triggers — Temporary Repairs and Replacement in Kind
  • Permit-to-Work Interfaces — Simultaneous Operations and Handover Quality
  • Energy Isolation and Line Breaking — Verification Before Opening Equipment
  • Pre-Startup Safety Review — Returning Equipment to Service
  • Contractor Competence Checks — Briefing Crews on Unit Hazards

Day 5: Practising the Safety-Critical Element Maintenance Plan

  • Bow-Tie Barrier Mapping for a Participant's Own Unit — Gap Identification
  • Performance Standard Drafting for Three Barriers — Verification Criteria
  • Deferral Risk Assessment Case — Gas Plant and Chemical Site Examples
  • Leading and Lagging Process Safety Indicators — Barrier Health Reporting
  • Safety-Critical Element Maintenance Plan — Final Presentation and Peer Challenge

Applying Mechanical Integrity and Safety-Critical Equipment After the Course

  • Run a bow-tie walk-through with operators and technicians on one high-hazard system and record every impaired or unverified barrier.
  • Review the open deferred maintenance backlog against performance standards and escalate any safety-critical task lacking interim measures.

Mechanical Integrity and Safety-Critical Equipment Questions (FAQ)

What is Mechanical Integrity and Safety-Critical Equipment upkeep and why does it matter now?

It is the set of practices that keeps protective barriers and pressure equipment in verified condition through inspection, testing and controlled change. It matters now because ageing plant and leaner crews make silent barrier degradation more likely.

Which roles gain most from Mechanical Integrity and Safety-Critical Equipment?

Operations and maintenance supervisors gain most, together with planners, shift leads and reliability staff. It suits anyone who approves bypasses or deferrals.

How does Mechanical Integrity and Safety-Critical Equipment differ from a hazard study course?

It focuses on keeping barriers working during service rather than identifying hazards at design. A hazard study course teaches facilitation of risk reviews; this one teaches inspection, proof testing, deferral control and change control on operating equipment.

What do you bring back from Mechanical Integrity and Safety-Critical Equipment?

You bring back a Safety-Critical Element Maintenance Plan for your own unit, with barrier maps and draft performance standards.

Mechanical Integrity and Safety-Critical Equipment: The Way Forward

The Safety-Critical Element Maintenance Plan first informs which overdue protective tasks must be completed before the next production push. Maintenance planners, area authorities and shift supervisors use it to schedule proof tests and approve deferrals. After first use, compare the performance standards with actual test results to expose barriers assumed healthy without evidence.

Questions about dates, fees and booking

When does this course next run?

The next session runs 27 – 31 December 2026 in Dubai. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Dubai, Cairo, Muscat, Madrid, Amman, Barcelona, Vienna, Manama, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 14 – 18 February 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train