Skip to content

Oil and Gas Facility Commissioning and Startup Testing Training Course

From mechanical completion to first hydrocarbons: test packs, loop checks, punch lists and safe startup sequencing for project and operations teams.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 23 – 27 November 2026 in London. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
London
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

August 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Oil and Gas Facility Commissioning and Startup Testing is a 1-week training course for commissioning engineers, startup leads and operations staff who carry a new or modified plant from mechanical completion to stable production, building a startup readiness dossier along the way. Owners now expect first hydrocarbons sooner, with fewer handover disputes and no loss of containment during introduction of process fluids. The course is delivered by Jupiter Prime Training.

Why Oil and Gas Facility Commissioning and Startup Testing Matters Now

Three forces shape commissioning today: compressed project schedules that push construction and testing into overlapping windows, digital completion systems that replace paper check sheets, and a thinner pool of experienced startup personnel as veteran staff retire. A facility that reaches mechanical completion with open punch items or unverified loops tends to suffer trips and leaks in its first months. The course rests on systems-based completion practice, the Process Safety Management (PSM) element of pre-startup safety review, and IEC 61511 for testing safety instrumented functions before they are relied upon.

Who Gains Most from Oil and Gas Facility Commissioning and Startup Testing

  • Engineers who define commissioning systems and subsystems and own their test packs
  • Startup leads who sequence energisation, purging and first introduction of hydrocarbons
  • Operations staff who accept systems from the project and run them after handover
  • Instrument and electrical technicians who perform loop checks and functional tests
  • Completion coordinators who track punch items, certificates and turnover dossiers

Joint project and operations teams gain most when members attend together.

Oil and Gas Facility Commissioning and Startup Testing Capabilities

Participants practise moving a system from construction completion through energised testing to operational acceptance with clear evidence at every gate.

  • Design a system and subsystem breakdown with boundaries drawn on marked-up P&IDs — completion sequencing
  • Specify pre-commissioning activities such as flushing, hydrotesting, drying and inerting — readiness for energisation
  • Test instrument loops, interlocks and safety functions against cause-and-effect charts — startup authorisation
  • Build a punch list categorisation that separates startup-critical items from deferrable ones — handover acceptance
  • Apply a pre-startup safety review checklist with operations and process safety staff — release of hydrocarbons
  • Calculate performance test results against contracted design duties — contractor close-out

Key Oil and Gas Facility Commissioning and Startup Testing Terms

  • Mechanical Completion — the point at which a system is built, tested for integrity and documented as ready for pre-commissioning activities.
  • Pre-Commissioning — non-energised activities such as cleaning, flushing, pressure testing and drying that prepare equipment for live testing.
  • Loop Check — verification that a field instrument, its wiring and its control system point respond correctly end to end.
  • Punch List — the register of outstanding defects or incomplete work, ranked by whether they block startup or handover.
  • Pre-Startup Safety Review — a structured check that hazards, procedures and training are in place before hazardous materials are introduced.
  • Turnover Dossier — the bundle of certificates, test records and drawings that transfers custody of a system to operations.

Oil and Gas Facility Commissioning and Startup Testing Day by Day

Day 1: Completion Philosophy and System Boundaries

  • Commissioning Execution Strategy — Phasing Construction Versus Testing Windows
  • System and Subsystem Breakdown — Defining Handover Units on P&IDs
  • Completion Management Software — Tracking Check Sheets and Certificates
  • Preservation Records — Protecting Idle Equipment Before Energisation
  • Roles Matrix for Construction, Commissioning and Operations — Clarifying Custody

Day 2: Mechanical Completion and Pre-Commissioning

  • Hydrotest and Pneumatic Test Packs — Confirming Pressure Integrity
  • Flushing, Blowing and Chemical Cleaning — Removing Construction Debris
  • Drying, Purging and Nitrogen Inerting — Preparing for Hydrocarbon Entry
  • Rotating Equipment Alignment and Solo Runs — Readiness of Pumps and Compressors
  • Punch Item Categorisation A, B and C — Gating Mechanical Completion

Day 3: Energised Testing and Control Systems

  • Instrument Loop Checks — Verifying Field-to-Control-Room Signals
  • Cause-and-Effect Chart Testing — Proving Shutdown Logic
  • Safety Instrumented Function Proof Tests to IEC 61511 — Startup Reliance
  • Electrical Energisation and Switchgear Testing — Safe Power Introduction
  • Utilities Commissioning Sequence — Air, Water, Steam and Flare Readiness

Day 4: Startup Sequencing and Acceptance

  • Pre-Startup Safety Review — Authorising Introduction of Process Fluids
  • Startup Procedure and Hold Points — Sequencing First Hydrocarbons
  • Leak Testing With Service Media — Containment Before Ramp-Up
  • Performance Testing Against Design Duties — Contractor Acceptance
  • Turnover Dossier Assembly — Transferring Custody to Operations

Day 5: Practising the Startup Readiness Dossier

  • System Boundary Exercise on a Gas Compression Train — Applying Day 1
  • Pre-Commissioning Plan for a Crude Stabilisation Unit — Applying Day 2
  • Loop and Interlock Test Schedule Drill — Applying Day 3
  • Startup Lessons From Offshore and Refinery Cases — Avoiding Repeat Trips
  • Startup Readiness Dossier — Completing Gates, Evidence and Hold Points

Applying Oil and Gas Facility Commissioning and Startup Testing After the Course

  • Re-rank the open punch list on a current system using startup-critical and deferrable categories, and agree the ranking with operations.
  • Run a pre-startup safety review rehearsal on the next system due for energisation, using the checklist built during the course.

Oil and Gas Facility Commissioning and Startup Testing Questions (FAQ)

What is oil and gas facility commissioning and startup testing and why does it matter now?

It is the disciplined process of proving a built plant safe and ready before process fluids enter it. Compressed schedules make structured completion evidence essential.

Which roles gain most from oil and gas facility commissioning and startup testing?

Commissioning engineers, startup leads and operations staff gain most. Instrument technicians and completion coordinators also benefit.

How does oil and gas facility commissioning and startup testing differ from shutdown or turnaround planning?

It concerns first startup of new or modified systems, not restarting a plant after maintenance. The focus is completion gates and handover evidence rather than outage scheduling.

What do you bring back from oil and gas facility commissioning and startup testing?

You bring back a startup readiness dossier template with gates, test schedules and hold points.

Oil and Gas Facility Commissioning and Startup Testing: The Way Forward

The startup readiness dossier gives each system a single record of completion gates, test evidence and hold points. Its first use is the decision to release a system for energisation, taken jointly by the startup lead and the operations superintendent. After the first startup, revisit how punch items were categorised.

Questions about dates, fees and booking

When does this course next run?

The next session runs 23 – 27 November 2026 in London. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: London, Amman, Vienna, Manama, Cairo, Muscat, Dubai, New York, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 24 – 28 January 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train