Skip to content

Onshore and Offshore Integrity Inspection Planning Training Course

Rank platforms, pipelines and onshore plant by risk, set inspection intervals and decide how anomalies are repaired, monitored or derated.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 30 November – 4 December 2026 in Amsterdam. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Amsterdam
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

September 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Onshore and Offshore Integrity Inspection Planning is a 1-week training course for facility integrity, structural and subsea engineers who set where, when and how plant is examined, and it builds an inspection and anomaly response plan for a mixed portfolio. Ageing platforms, long pipelines and busy onshore plants now compete for limited inspection budgets and vessel time. Jupiter Prime Training delivers Onshore and Offshore Integrity Inspection Planning as a course grounded in field decisions.

Why Onshore and Offshore Integrity Inspection Planning Matters Now

Three forces shape inspection planning today. Many offshore jackets, subsea lines and onshore process units are running past their original design life, so degradation is less predictable. Operators face tighter scrutiny from insurers, partners and safety authorities, who expect inspection effort to follow risk rather than habit. An organisation that plans well finds wall loss and cracking before leaks or shutdowns; one that plans badly spends heavily on low-risk equipment while critical barriers go unexamined. The course rests on risk-based inspection (RBI) and fitness-for-service (FFS) thinking, described in general terms.

Who Gains Most from Onshore and Offshore Integrity Inspection Planning

  • Engineers who own static equipment and piping inspection scopes on onshore plants
  • Structural engineers responsible for jacket, topside and splash zone surveys
  • Subsea and pipeline engineers who specify inline, ROV and diver surveys
  • Inspection coordinators who bundle scopes into shutdown and vessel campaigns
  • Corrosion specialists who interpret wall thickness and crack growth data

Integrity groups that cover both offshore and onshore assets gain most when several members attend together.

Onshore and Offshore Integrity Inspection Planning Capabilities

Participants move from listing equipment to setting defensible inspection intervals and response rules for platforms, pipelines and plants.

  • Assess degradation exposure for each asset class — inspection scope owners
  • Calculate inspection intervals from remaining life estimates — maintenance planners
  • Weigh non-destructive testing techniques by effectiveness — inspection contractors
  • Design campaign schedules around shutdowns and vessel windows — operations leads
  • Apply severity bands to anomalies — facility managers deciding repair or derate
  • Specify the evidence needed for life extension — asset owners and partners

Key Onshore and Offshore Integrity Inspection Planning Terms

  • Risk-Based Inspection (RBI) — a method that sets inspection type and frequency from the probability and consequence of each failure.
  • Safety-Critical Element — equipment or structure whose failure could cause or fail to limit a major accident.
  • Anomaly — a recorded condition outside acceptance criteria, such as wall loss, a dent or a crack, needing a decision.
  • Fitness-for-Service (FFS) — an engineering assessment of whether damaged equipment can keep operating safely, and under what limits.
  • Inspection Effectiveness — how far a chosen technique reduces uncertainty about the real condition of a component.
  • Remaining Life — the estimated time before degradation brings a component to its minimum acceptable condition.

Onshore and Offshore Integrity Inspection Planning Day by Day

Day 1: Inspection Exposure Across Land and Marine Assets

  • Asset Register Segmentation — Which Platforms, Pipelines and Plants Need Attention
  • Degradation Mechanism Screening — Corrosion, Fatigue and Erosion Exposure by Asset
  • Safety-Critical Element Listing — Which Barriers Drive Inspection Priority
  • Consequence of Failure Grading — People, Environment and Production Exposure
  • Inspection History Gap Check — Where Records Leave Condition Unknown

Day 2: Risk-Based Inspection Logic

  • Probability of Failure Estimation — Ranking Wall Loss and Crack Growth
  • Risk Matrix Calibration — Setting Acceptance Bands for Each Asset Class
  • Inspection Interval Derivation — Linking Remaining Life to Next Visit
  • Inspection Effectiveness Grading — Choosing Techniques That Reduce Uncertainty
  • Static Equipment Versus Structural Logic — Where Methods Diverge

Day 3: Inspection Techniques and Campaign Scheduling

  • Non-Destructive Testing Selection — Ultrasonic, Radiography and Eddy Current Trade-Offs
  • Subsea Survey Methods — ROV, Diver and Inline Tool Choices
  • Topside and Jacket Structural Surveys — Splash Zone and Node Coverage
  • Campaign Bundling — Grouping Scopes Around Shutdowns and Vessel Windows
  • Access, Isolation and Permit Constraints — Sequencing Field Execution

Day 4: Anomaly Response and Life Extension

  • Anomaly Classification — Severity Bands and Response Timeframes
  • Fitness-for-Service Screening — Deciding Repair, Monitor or Derate
  • Temporary Repair Options — Clamps, Sleeves and Composite Wraps
  • Life Extension Assessment — Evidence Needed to Run Beyond Design Life
  • Integrity Data Trending — Spotting Accelerating Degradation Early

Day 5: Practising the Inspection and Anomaly Response Plan

  • Asset Exposure Profile — Applying Day 1 Screening to a Case Facility
  • Inspection Interval Set — Applying Risk Logic to Mixed Asset Types
  • Campaign Schedule Draft — Applying Bundling to Shutdown and Vessel Windows
  • Anomaly Response Matrix — Applying Severity Bands to Sample Findings
  • Inspection and Anomaly Response Plan — Completing and Presenting the Draft

Applying Onshore and Offshore Integrity Inspection Planning After the Course

  • Re-rank the safety-critical elements of one facility using the consequence grading and risk matrix taught.
  • Run an anomaly review of open findings, applying severity bands and fitness-for-service screening to close or escalate each one.

Onshore and Offshore Integrity Inspection Planning Questions (FAQ)

What is Onshore and Offshore Integrity Inspection Planning and why does it matter now?

It is the practice of deciding where, when and how platforms, pipelines and plants are examined. It matters now because many assets run beyond design life while inspection budgets and vessel time stay limited.

Which roles gain most from Onshore and Offshore Integrity Inspection Planning?

Facility integrity, structural, subsea and pipeline engineers gain most, along with inspection coordinators and corrosion specialists.

How does Onshore and Offshore Integrity Inspection Planning differ from an integrity management system course?

It focuses on field inspection logic and anomaly handling rather than governance. A management system course covers policies, performance indicators and assurance; this course covers intervals, techniques, campaign schedules and repair decisions.

What do you bring back from Onshore and Offshore Integrity Inspection Planning?

You bring back a draft inspection and anomaly response plan for a case facility. It holds ranked assets, intervals, a campaign schedule and a severity matrix.

Onshore and Offshore Integrity Inspection Planning: The Way Forward

The inspection and anomaly response plan first informs which assets receive scarce inspection effort in the next campaign. Integrity engineers, inspection coordinators and operations leads use it to agree scopes and response timeframes. After its first use, revisit the consequence grading and interval logic against new findings, so the plan tracks real degradation rather than original assumptions.

Questions about dates, fees and booking

When does this course next run?

The next session runs 30 November – 4 December 2026 in Amsterdam. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Amsterdam, Milan, Dar es Salaam, New York, Abu Dhabi, Muscat, London, Cairo, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 27 June – 1 July 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train