Risk-Based Inspection of Reinforced Concrete Training Course
Rank concrete elements by corrosion likelihood and consequence to set inspection intervals, testing scope and repairs across ageing bridges, jetties and buildings.
This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 23 – 27 November 2026 in Milan. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Milan
- Scheduled dates
- 25
- Classroom cities
- 24
- Classroom fee from
- 4,000 £
- Online fee from
- 2,900 £
When and where does this course run?
Showing 1–20 of 25 dates
November 2026
December 2026
January 2027
February 2027
March 2027
April 2027
May 2027
June 2027
July 2027
August 2027
September 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Risk-Based Inspection of Reinforced Concrete is a 1-week training course for civil and structural inspection engineers who assess ageing concrete assets and need a defensible risk-ranked concrete inspection plan. Owners of bridges, jetties, industrial plants and tall buildings now face tighter budgets and older structures, so inspection effort must follow the real threat of reinforcement corrosion. Jupiter Prime Training delivers Risk-Based Inspection of Reinforced Concrete for this purpose.
Why Risk-Based Inspection of Reinforced Concrete Matters Now
Three forces shape concrete asset care today. Much infrastructure built decades ago is reaching the age at which carbonation fronts and chloride ingress reach the steel. Owners and insurers expect inspection intervals justified by evidence rather than habit. An organisation that handles this well spends its testing and repair effort where spalling, section loss or collapse is most likely; one that handles it badly misses hidden pitting until repairs become strengthening. The course rests on the likelihood and consequence logic of risk-based inspection (RBI) and recognised principles of concrete condition assessment.
Who Gains Most from Risk-Based Inspection of Reinforced Concrete
- Engineers responsible for routine and principal inspections of bridges, marine structures and buildings
- Specialists responsible for non-destructive testing and sampling of concrete members
- Engineers responsible for repair scoping and durability recommendations
- Asset integrity staff responsible for inspection schedules across a structure portfolio
- Consultants responsible for condition reports submitted to owners and insurers
A structures or asset integrity unit gains most when its inspectors and repair engineers attend together and agree one ranking language.
Risk-Based Inspection of Reinforced Concrete Capabilities
Participants move from recording defects to explaining the deterioration mechanism behind them and its pace.
- Assess carbonation depth and cover against the reinforcement position — repair urgency for each member
- Calculate chloride profiles and threshold exceedance at bar depth — splash and tidal zone priorities
- Classify crack patterns by cause and activity — structural versus durability response
- Apply half-cell potential and resistivity results to corrosion likelihood — test location selection
- Build a likelihood and consequence matrix for concrete elements — inspection interval setting
- Communicate ranked findings and repair options — owners, insurers and maintenance contractors
Key Risk-Based Inspection of Reinforced Concrete Terms
- Carbonation — reaction of carbon dioxide with cement paste that lowers alkalinity and removes the passive layer on steel.
- Chloride threshold — concentration of chloride at the bar surface above which active corrosion of reinforcement is expected to start.
- Half-cell potential — electrochemical reading taken over the concrete surface that indicates the probability of active reinforcement corrosion beneath it.
- Concrete cover — depth of concrete between the outer surface and the nearest reinforcing bar.
- Consequence of failure — the safety, operational and repair impact if a concrete element loses its intended function.
- Inspection interval — the planned time between examinations of an element, set from its ranked likelihood and consequence.
Risk-Based Inspection of Reinforced Concrete Day by Day
Day 1: Concrete Deterioration and the Case for Risk Ranking
- Passive Film and Corrosion Cell Basics — Which Mechanisms Threaten Steel
- Exposure Classes and Microclimates — Where Aggressive Agents Concentrate
- Time-Based Versus Risk-Based Inspection Logic — Shifting Inspection Effort
- Asset Inventory and Element Breakdown — Ranking at Member Level
- Inspection History and Drawing Review — Filling Knowledge Gaps Before Site Work
Day 2: Carbonation and Chloride Ingress Assessment
- Phenolphthalein Depth Testing — Carbonation Front Against Cover Depth
- Covermeter Surveys — Locating Bars and Thin Cover Zones
- Chloride Dust Sampling and Profiling — Threshold Exceedance at Bar Depth
- Diffusion-Based Ingress Estimation — Time to Corrosion Initiation
- Marine and De-Icing Salt Exposure Comparison — Bridge and Jetty Priorities
Day 3: Cracking and Corrosion Activity Evidence
- Crack Mapping and Width Measurement — Structural or Durability Origin
- Alkali-Silica Reaction and Shrinkage Signatures — Distinguishing Non-Corrosion Cracking
- Half-Cell Potential Mapping — Probability of Active Corrosion
- Resistivity and Corrosion Rate Readings — Speed of Section Loss
- Delamination Sounding and Breakout Checks — Confirming Hidden Pitting
Day 4: Likelihood, Consequence and Interval Decisions
- Likelihood Scoring From Test Evidence — Weighting Each Deterioration Indicator
- Consequence Scoring for Load Paths and Occupancy — Safety and Service Impact
- Concrete Risk Matrix Construction — Ranking Elements Across the Portfolio
- Interval Setting and Inspection Scope Rules — Matching Effort to Risk Rank
- Repair and Protection Options Screening — Patch, Coatings or Cathodic Protection
Day 5: Practising the Risk-Ranked Concrete Inspection Plan
- Case Element Testing Data Interpretation — Applying Carbonation and Chloride Results
- Crack and Potential Map Synthesis — Applying Corrosion Activity Evidence
- Portfolio Ranking Exercise on Two Structures — Applying the Risk Matrix
- Condition Report Structure for Owners — Presenting Ranked Findings Clearly
- Risk-Ranked Concrete Inspection Plan Completion — Intervals, Tests and Repairs
Applying Risk-Based Inspection of Reinforced Concrete After the Course
- Lead a pilot ranking of one structure's elements using cover, carbonation and chloride data already on file.
- Revise the next inspection schedule so high-ranked splash zone and joint elements receive half-cell and chloride testing first.
Risk-Based Inspection of Reinforced Concrete Questions (FAQ)
What is risk-based inspection of reinforced concrete and why does it matter now?
It is a method that sets inspection effort by the likelihood and consequence of reinforcement corrosion and cracking. It matters now because many structures are reaching the age at which carbonation and chlorides reach the steel while budgets stay tight.
Which roles gain most from risk-based inspection of reinforced concrete?
Inspection, testing and repair engineers gain most. They collect the cover, chloride and potential evidence, and turn it into ranked intervals and repair scopes.
How does risk-based inspection of reinforced concrete differ from a general concrete repair course?
It focuses on deciding where and when to inspect, not on repair execution. You learn to rank elements from test evidence, while a repair course covers materials and application.
What will you bring back from risk-based inspection of reinforced concrete?
You bring back a ranked plan for a structure portfolio. It lists each element's risk scores, required tests, next interval and repair options.
Risk-Based Inspection of Reinforced Concrete: The Way Forward
The risk-ranked concrete inspection plan first informs which elements receive intrusive testing in the next inspection cycle. Inspection engineers, repair designers and asset owners use it to agree scope and budget. After its first use, revisit the consequence scores as occupancy, load paths and exposure change, so the ranking keeps pace with how each structure is used.
Find more Maintenance, Reliability & Asset Integrity Training Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 23 – 27 November 2026 in Milan. It is one of 25 dates scheduled up to November 2027.
Where is this course held?
In a classroom in 24 cities: Milan, London, Amman, Dar es Salaam, Dubai, Cairo, Rome, Manama, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. One date is scheduled as a live online session: 25 – 29 July 2027, from 2,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.