Should-Cost Planning and Value Engineering Training Course
Engineer should-cost models and value studies that challenge supplier bids, size contingency and lock in savings before scope is fixed.
This 1-week course has 50 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 22 – 26 November 2026 in Abu Dhabi. Fees per participant run from 3,300 £ (Amman) to 7,900 £ (New York) in a classroom, and from 1,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Abu Dhabi
- Scheduled dates
- 50
- Classroom cities
- 24
- Classroom fee from
- 3,300 £
- Online fee from
- 1,900 £
When and where does this course run?
Showing 1–20 of 50 dates
November 2026
December 2026
January 2027
February 2027
March 2027
April 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Should-Cost Planning and Value Engineering is a 1-week training course for project cost controllers, estimators and budget owners who need to build a should-cost model and value engineering register before scope is fixed. Rising input prices and tighter capital scrutiny mean organisations must know what a scope ought to cost, not only what suppliers quote. Jupiter Prime Training presents Should-Cost Planning and Value Engineering as a discipline of cost evidence and design choice.
Why Should-Cost Planning and Value Engineering Matters Now
Three forces shape cost planning today: volatile material and labour indices, sponsors who expect evidence before approving capital, and suppliers who price risk into every quotation. An organisation that models cost bottom-up can challenge bids, set credible baselines and remove waste at the design stage, when change is cheap. One that relies on historical averages tends to lock in avoidable cost and discovers overruns late. The course rests on Value Engineering (VE) job-plan practice, Activity-Based Costing (ABC) and Earned Value Management (EVM).
Who Gains Most from Should-Cost Planning and Value Engineering
- Professionals who prepare bottom-up estimates and price breakdowns for new scopes
- Specialists who set and defend baseline budgets and contingency reserves
- Controllers who track committed cost, earned value and forecast at completion
- Owners of capital or operating budgets who approve scope and change requests
- Buyers who compare supplier quotations against an independent cost view
The greatest gain comes when an estimating, procurement and engineering trio from the same project attends together and leaves with one shared cost model.
Should-Cost Planning and Value Engineering Capabilities
Participants turn cost drivers, function analysis and forecasting into evidence that changes scope and sourcing choices.
- Build a should-cost breakdown from material, labour, overhead and margin drivers — supplier negotiation
- Apply function analysis to separate essential from secondary features — design trade-off decisions
- Calculate contingency from quantified risk rather than flat percentages — sponsor approval
- Test earned value and forecast-at-completion figures against the cost baseline — budget owners
- Weigh change requests by life-cycle cost impact — change control boards
- Communicate cost optimisation options with clear savings logic — finance committees
Key Should-Cost Planning and Value Engineering Terms
- Should-cost model — an independent estimate of what a product or scope ought to cost, built from its underlying cost drivers.
- Value engineering — a structured review of functions that seeks the lowest life-cycle cost without reducing required performance.
- Function analysis — describing each element by a verb and noun to judge whether its cost matches the function it serves.
- Cost baseline — the approved, time-phased budget against which actual and earned cost are compared.
- Management reserve — budget held outside the baseline for unforeseen scope, released only by formal approval.
- Forecast at completion — the expected total cost of a scope, combining actual cost to date with an estimate to complete.
Should-Cost Planning and Value Engineering Day by Day
Day 1: Cost Drivers and Estimate Classes
- Estimate Class Matrix — Matching Accuracy to Project Stage
- Cost Breakdown Structure — Aligning Estimates with Work Packages
- Parametric and Analogous Estimating — Early Feasibility Screening
- Material and Labour Indices — Escalation Assumptions in Forecasts
- Activity-Based Costing (ABC) — Tracing Overheads to Scope Elements
Day 2: Building the Should-Cost View
- Bottom-Up Should-Cost Breakdown — Challenging Supplier Quotations
- Supplier Margin and Risk Premium Analysis — Negotiation Positions
- Learning Curve Effects — Pricing Repeat Units and Batches
- Make-or-Buy Relevant Costing — Sourcing Route Selection
- Total Cost of Ownership Model — Life-Cycle Purchase Choices
Day 3: Value Engineering Job Plan
- Function Analysis System Technique (FAST) Diagram — Scope Clarity
- Cost-to-Function Ratio — Targeting High-Cost Low-Value Elements
- Creative Alternatives Session — Generating Design Options
- Weighted Evaluation Matrix — Ranking Alternatives by Value
- Value Engineering Proposal Format — Sponsor and Design Sign-Off
Day 4: Baselines, Contingency and Forecasting
- Time-Phased Cost Baseline — Budget Release and Cash Planning
- Quantified Risk Contingency — Reserve Sizing and Ownership
- Earned Value Management (EVM) Indices — Early Overrun Signals
- Forecast at Completion Methods — Reforecast and Funding Requests
- Change Request Cost Impact Log — Change Board Decisions
Day 5: Practising the Should-Cost Model and Value Register
- Case Scope Estimate Rebuild — Applying Estimate Classes and Drivers
- Case Supplier Bid Challenge — Applying the Should-Cost Breakdown
- Case Value Study — Applying FAST and Weighted Evaluation
- Savings Tracking Dashboard — Confirming Realised Cost Optimisation
- Should-Cost Model and Value Register — Completing the Work Product
Applying Should-Cost Planning and Value Engineering After the Course
- Rebuild the estimate for one live package as a should-cost breakdown and use it in the next supplier negotiation.
- Lead a short function analysis review on a scope still in design and log each proposal with its life-cycle saving.
Should-Cost Planning and Value Engineering Questions (FAQ)
What is Should-Cost Planning and Value Engineering and why does it matter now?
It is the practice of modelling what a scope ought to cost and then removing cost that adds no function. With volatile input prices and closer capital scrutiny, it gives you evidence to challenge bids and protect budgets before commitments are made.
Which roles gain most from Should-Cost Planning and Value Engineering?
Estimators, cost controllers, budget owners and buyers gain most. Each uses the should-cost view differently: estimators to build it, controllers to track against it, owners to approve scope and buyers to negotiate with suppliers.
How does Should-Cost Planning and Value Engineering differ from a general budgeting course?
It works earlier and deeper than a budgeting course. Instead of allocating and monitoring annual budgets, you build independent cost models for specific scopes and change the design or sourcing before cost is locked in.
What do you bring back from Should-Cost Planning and Value Engineering?
You bring back a working cost model and a log of value proposals tested on a case scope. Both can be adapted to a live package, giving your project an independent cost view and a record of savings ideas.
Should-Cost Planning and Value Engineering: The Way Forward
The should-cost model and value register first informs the next supplier negotiation or design freeze, where an independent cost view shifts the discussion from price to drivers. Estimators maintain it, buyers draw on it and budget owners use it to approve scope. After its first use, revisit the contingency logic and the realised savings to see which value proposals held under delivery pressure.
Find more Accounting, Financial Reporting & Budgeting Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 22 – 26 November 2026 in Abu Dhabi. It is one of 50 dates scheduled up to November 2027.
Where is this course held?
In a classroom in 24 cities: Abu Dhabi, Doha, Munich, Madrid, Manama, Casablanca, Rome, Singapore, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. 2 dates are scheduled as live online sessions; the next runs 13 – 17 December 2026, from 1,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 3,300 £ (Amman) to 7,900 £ (New York) in a classroom, and from 1,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.