Tank Floor Corrosion Scanning and Settlement Survey Training Course
Find hidden bottom plate loss and measure foundation movement with MFL scanning, ultrasonic prove-up and elevation surveys, for tank inspectors and integrity engineers.
This 1-week course has 25 dates from December 2026 to November 2027 in 24 cities and live online. The next session runs 28 December 2026 – 1 January 2027 in Singapore. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Singapore
- Scheduled dates
- 25
- Classroom cities
- 24
- Classroom fee from
- 4,000 £
- Online fee from
- 2,900 £
When and where does this course run?
Showing 1–20 of 25 dates
December 2026
January 2027
February 2027
March 2027
April 2027
May 2027
June 2027
July 2027
August 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Tank Floor Corrosion Scanning and Settlement Survey is a 1-week training course for tank inspectors, integrity engineers and terminal maintenance staff, built around one work product: a floor scan and settlement findings dossier. Soil-side pitting and uneven foundations now drive many unplanned tank outages, so terminals need floor and foundation evidence they can trust before a bottom is cleared for another run. Jupiter Prime Training delivers Tank Floor Corrosion Scanning and Settlement Survey.
Why Tank Floor Corrosion Scanning and Settlement Survey Matters Now
Three forces shape floor scanning and settlement work today. Ageing tanks run longer between entries, so each visit must capture more of the bottom plate. Scanning technology has moved from point thickness readings to magnetic flux leakage (MFL) floor scanners and phased array ultrasonic testing (PAUT). A terminal that reads its floor maps and survey elevations well extends bottom life with confidence and plans entries calmly; one that reads them poorly risks product leaks into soil and costly emergency floor replacement.
Who Gains Most from Tank Floor Corrosion Scanning and Settlement Survey
- Inspectors operating floor scanners and marking indications
- Engineers turning indications into remaining floor life
- Crews taking floor and foundation elevation readings
- Leads scheduling tank entries and bottom cleaning
- Specialists selecting cathodic protection and underside coatings
A terminal integrity group gains most when its scanner operators, survey crew and reviewing engineer attend together.
Tank Floor Corrosion Scanning and Settlement Survey Capabilities
Participants practise reading MFL signal maps, sizing pits with ultrasonic prove-up and fitting elevation data to settlement curves.
- Plan an MFL floor scanning sweep with critical zones and scan coverage — scanner crew and entry planner
- Apply ultrasonic prove-up to size soil-side and product-side pits — integrity engineer sign-off
- Build an underside corrosion map from scan indications and prove-up thickness — bottom life estimate
- Calculate edge settlement, planar tilt and out-of-plane deflection from survey points — foundation decision
- Assess differential settlement within the floor and near the shell-to-bottom weld — repair scope
- Communicate floor and foundation findings in one dossier — terminal manager and maintenance planner
Key Tank Floor Corrosion Scanning and Settlement Survey Terms
- MFL floor scanning — a magnetic method sensing flux leakage from thinned bottom plate areas.
- Ultrasonic prove-up — follow-up thickness readings confirming each scanner indication's depth.
- Soil-side corrosion — hidden metal loss on the underside of the floor plate.
- Edge settlement — downward movement of the bottom near the shell.
- Planar tilt — uniform rigid-body tipping of the whole tank.
- Differential settlement — uneven sinking between survey points beyond rigid tilt.
Tank Floor Corrosion Scanning and Settlement Survey Day by Day
Day 1: Floor Deterioration and Foundation Behaviour
- Soil-Side and Product-Side Pitting Mechanisms — Choosing Where Scanning Effort Goes
- Foundation Types, Pad Materials and Drainage — Predicting Settlement Patterns
- Bottom Plate Layout, Lap Welds and Sketch Plates — Planning Scan Lanes
- Cathodic Protection and Underside Coatings — Judging Expected Corrosion Rates
- Floor Cleaning and Surface Preparation Standard — Securing Scan Data Quality
Day 2: MFL Floor Scanning in the Field
- MFL Scanner Calibration Plates and Thresholds — Setting Reporting Sensitivity
- Scan Coverage Grids and Annular Zone Access — Avoiding Unscanned Bottom Areas
- Signal Interpretation and False Calls — Separating Real Loss From Noise
- Handheld Scanners Near Welds and Sumps — Closing Coverage Gaps
- Floor Indication Marking and Numbering — Linking Field Marks to Maps
Day 3: Ultrasonic Follow-Up and Underside Corrosion Mapping
- Ultrasonic Thickness Prove-Up Technique — Confirming Pit Depth Before Repair
- Phased Array Corrosion Mapping (PAUT) — Profiling Clusters of Underside Loss
- Floor Corrosion Map Layering — Showing Loss Location and Severity Together
- Minimum Remaining Floor Thickness Estimates — Deciding Patch or Replace
- Floor Corrosion Rate Trending Between Entries — Setting the Next Entry Interval
Day 4: Settlement Survey and Foundation Evaluation
- Shell Elevation Survey Point Spacing — Capturing the True Settlement Shape
- Planar Tilt Best-Fit Plane Calculation — Separating Rigid Tilt From Distortion
- Out-of-Plane Shell Settlement Curves — Judging Shell Stress Risk
- Edge Settlement and Bottom Bulge Measurement — Deciding Releveling or Floor Work
- Internal Floor Elevation Profiles — Locating Differential Settlement and Ponding
Day 5: Practising the Floor Scan and Settlement Findings Dossier
- Combined Scan and Survey Data Review — Reconciling Floor Loss With Foundation Movement
- Repair Option Ranking for Floor and Pad — Choosing Patch, Overlay or Releveling
- Scan and Survey Case Exercises From Refining and Chemical Storage — Testing Judgement
- Entry Interval Setting From Floor Rates — Agreeing the Next Out-of-Service Visit
- Findings Dossier Assembly and Peer Check — Completing the Floor Scan and Settlement Dossier
Applying Tank Floor Corrosion Scanning and Settlement Survey After the Course
- Audit the last floor scan record of one tank for coverage gaps, unproved indications and missing annular zone data.
- Refit the most recent shell elevation survey of a terminal tank into planar tilt and out-of-plane settlement and flag any differential settlement.
Tank Floor Corrosion Scanning and Settlement Survey Questions (FAQ)
What is tank floor corrosion scanning and settlement survey, and why does it matter now?
It finds bottom plate metal loss with scanners and measures foundation movement with elevation surveys. It matters now because tanks run longer between entries, so each visit needs reliable floor evidence.
Which roles gain most from tank floor corrosion scanning and settlement survey?
Scanner operators, integrity engineers, survey crews, terminal maintenance leads and corrosion specialists gain most.
How does a tank floor corrosion scanning and settlement survey course differ from a general storage tank inspection course?
It focuses only on the bottom and the foundation. Wider tank inspection courses cover every component; here all one week go to scanning, prove-up, corrosion maps and settlement.
What do you bring back from tank floor corrosion scanning and settlement survey training?
You bring back a structured dossier format that joins scan maps, prove-up thickness and settlement results. It sets repair scope at the next entry.
Tank Floor Corrosion Scanning and Settlement Survey: The Way Forward
The floor scan and settlement findings dossier first informs whether a bottom can stay in service until the next entry. Integrity engineers, maintenance planners and terminal managers use it to agree repair scope and timing. After its first use, revisit the scan thresholds and survey point spacing, since both shape how much hidden floor loss and foundation movement the dossier reveals.
Find more Petroleum Engineering & Oil and Gas Operations Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 28 December 2026 – 1 January 2027 in Singapore. It is one of 25 dates scheduled up to November 2027.
Where is this course held?
In a classroom in 24 cities: Singapore, Dubai, Rome, New York, Barcelona, Vienna, Istanbul, Paris, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. One date is scheduled as a live online session: 21 – 25 November 2027, from 2,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.