Total Productive Maintenance (TPM) Management Training Course
Production and maintenance leaders build OEE tracking, autonomous maintenance and a TPM rollout roadmap that makes operators partners in equipment care.
This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 29 November – 3 December 2026 in Sharm El-Sheikh. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Sharm El-Sheikh
- Scheduled dates
- 25
- Classroom cities
- 24
- Classroom fee from
- 4,000 £
- Online fee from
- 2,900 £
When and where does this course run?
Showing 1–20 of 25 dates
November 2026
December 2026
January 2027
February 2027
March 2027
April 2027
May 2027
June 2027
July 2027
August 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Total Productive Maintenance (TPM) Management is a 1-week training course for production and maintenance managers who lead plant-floor equipment care, built around a TPM rollout roadmap each participant drafts for one production line. Equipment losses, operator skill gaps and pressure on asset uptime make shared ownership of machines a priority for manufacturers and process plants. Jupiter Prime Training delivers this Total Productive Maintenance (TPM) Management course.
Why Total Productive Maintenance (TPM) Management Matters Now
Three forces shape TPM today: leaner crews who must keep more machines running, sensor data that exposes hidden stoppages and speed losses, and customers who expect steady output without overtime rescue. Plants that run TPM well turn operators into the first line of equipment care and free technicians for planned and predictive work. Plants that handle it badly run cleaning campaigns that fade and leave chronic breakdowns in place. The course rests on the eight-pillar TPM model and on Overall Equipment Effectiveness (OEE) as the shared measure of line losses.
Who Gains Most from Total Productive Maintenance (TPM) Management
- Leaders accountable for line output, changeover time and shift-level equipment stoppages
- Leaders responsible for maintenance scheduling, spare parts and technician skills
- Leaders who own continuous improvement teams and kaizen event selection
- Leaders in charge of equipment reliability and chronic failure elimination
- Leaders who coordinate operator training, skill matrices and frontline standards
A production manager and a maintenance manager from the same site gain most when they attend together, because TPM depends on both agreeing who cares for each machine.
Total Productive Maintenance (TPM) Management Capabilities
Participants move from loss measurement to pillar design, giving each machine an owner, a care standard and a loss target.
- Calculate OEE from availability, performance and quality records — line performance reviews with plant leaders
- Map the six big losses on a bottleneck machine — focused improvement priorities
- Design autonomous maintenance steps for operator crews — shift supervisors and line operators
- Build a planned maintenance calendar that complements operator tasks — maintenance planners
- Apply why-why and PM analysis to chronic breakdowns — reliability engineers
- Specify a phased TPM rollout with pilot line, pillar owners and audits — site leadership
Key Total Productive Maintenance (TPM) Management Terms
- Overall Equipment Effectiveness (OEE) — availability multiplied by performance and quality, showing how much planned production time becomes good output.
- Six big losses — breakdowns, setup and adjustment, minor stops, reduced speed, start-up rejects and production rejects that erode OEE.
- Autonomous maintenance — operators cleaning, inspecting, lubricating and tightening their own machines to detect abnormalities early.
- Focused improvement — small cross-functional teams removing one chronic equipment loss with structured problem-solving.
- CILT standard — a one-page sheet listing cleaning, inspection, lubrication and tightening points, methods and frequencies for one machine.
- Abnormality tag — a visible card hung on a machine to record a defect found by operators until it is repaired.
Total Productive Maintenance (TPM) Management Day by Day
Day 1: Equipment Losses and the TPM Model
- Eight-Pillar TPM House — Scope of Site Ambition
- OEE Calculation From Shift Records — Baseline for Line Targets
- Six Big Losses Mapping — Which Machine Gets Attention First
- Loss Tree Deployment — Linking Line Losses to Plant Cost
- Gemba Walk on a Bottleneck Asset — Evidence for Pilot Choice
Day 2: Operators as Equipment Owners
- Seven Steps of Autonomous Maintenance — Pace of Operator Handover
- Initial Cleaning and Abnormality Tagging — Defect Backlog Ownership
- CILT Standard Sheets — Frequency and Responsibility per Machine
- Sources of Contamination Countermeasures — Reducing Cleaning Time
- One-Point Lessons — Spreading Inspection Skills Across Shifts
Day 3: Planned Maintenance and Focused Improvement
- Planned Maintenance Pillar Calendar — Split of Operator and Technician Tasks
- Why-Why Analysis of Chronic Stops — Root Cause Acceptance
- PM Analysis for Physical Phenomena — Repair Versus Redesign Choice
- SMED Changeover Reduction — Setup Loss Recovery
- Kaizen Team Charters — Loss Selection and Ownership
Day 4: Quality, Early Equipment and Skills Pillars
- Quality Maintenance Matrix — Equipment Conditions That Prevent Rejects
- Early Equipment Management — Maintainability Input to New Purchases
- Operator and Technician Skill Matrix — Training Priorities
- Office TPM for Support Functions — Spares and Planning Delays
- Safety, Health and Environment Pillar — Hazards Found During Inspection
Day 5: Practising the TPM Rollout Roadmap
- Pilot Line OEE Baseline Rework — Target Setting for the First Phase
- Operator-Maintainer Partnership Agreement — Task Boundaries per Machine
- TPM Audit Checklist by Step — Readiness to Advance Lines
- Pillar Owner and Steering Structure — Accountability for Progress
- TPM Rollout Roadmap Draft — Phased Plan for One Production Line
Applying Total Productive Maintenance (TPM) Management After the Course
- Run an initial cleaning and abnormality tagging session on one bottleneck machine and log every tag to closure.
- Calculate weekly OEE for the pilot line and review the largest of the six big losses with a kaizen team.
Total Productive Maintenance (TPM) Management Questions (FAQ)
What is Total Productive Maintenance (TPM) Management and why does it matter now?
Total Productive Maintenance (TPM) Management is the leadership of a plant-wide approach where operators and technicians share equipment care to remove losses. It matters now because leaner crews must keep more machines available, and OEE data shows exactly where output is lost.
Which roles gain most from Total Productive Maintenance (TPM) Management?
Production and maintenance managers gain most from Total Productive Maintenance (TPM) Management. Continuous improvement, reliability and training leads also benefit.
How does Total Productive Maintenance (TPM) Management differ from a reliability-centred maintenance course?
Total Productive Maintenance (TPM) Management centres on people and loss elimination across the line. A reliability-centred course analyses failure modes asset by asset to choose maintenance tasks, while TPM builds operator ownership, OEE tracking and pillar structures for the whole plant.
What do you bring back from Total Productive Maintenance (TPM) Management?
You bring back a draft TPM rollout roadmap for one production line. It holds an OEE baseline, a loss map, CILT standards, an operator-maintainer task split and an audit checklist.
Total Productive Maintenance (TPM) Management: The Way Forward
The TPM rollout roadmap first informs which line becomes the pilot and which loss its kaizen team attacks. Plant managers, pillar owners and shift supervisors use it to assign tasks and track OEE. After the first audit, revisit the split of tasks between operators and technicians.
Find more Maintenance, Reliability & Asset Integrity Training Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 29 November – 3 December 2026 in Sharm El-Sheikh. It is one of 25 dates scheduled up to November 2027.
Where is this course held?
In a classroom in 24 cities: Sharm El-Sheikh, Geneva, Doha, London, Munich, Manama, Madrid, Amman, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. One date is scheduled as a live online session: 29 August – 2 September 2027, from 2,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.