Skip to content

UPS and Battery Charger Sizing and Commissioning Training Course

For electrical maintenance engineers who calculate UPS, battery and charger ratings and prove them through acceptance tests before handover

This 1-week course has 25 dates from December 2026 to November 2027 in 24 cities and live online. The next session runs 28 December 2026 – 1 January 2027 in Paris. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Paris
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

August 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

UPS and Battery Charger Sizing and Commissioning is a 1-week training course for electrical maintenance engineers and technicians who select, install and hand over critical power systems, and it ends with a UPS and Charger Sizing and Commissioning Dossier for one real installation. Growing loads, ageing battery rooms and tighter outage windows mean an undersized inverter or a poorly tested string can drop a control system without warning. Jupiter Prime Training delivers this course on UPS and battery charger sizing.

Why UPS and Battery Charger Sizing Matters Now

Three forces shape the subject today. Digital control systems, telecoms racks and data rooms add sensitive loads that older UPS ratings never anticipated. Battery chemistries are shifting, with valve-regulated lead-acid and lithium-ion banks sitting beside vented nickel-cadmium strings, each with its own charging regime. And operations teams expect critical power to be proven before handover rather than discovered during the first mains failure. A site that sizes and commissions well keeps protection, process control and emergency lighting alive through disturbances; one that guesses carries hidden autonomy gaps. The course rests on recognised IEC classification of UPS performance and on battery sizing practice from IEEE recommended methods, described in general terms.

Who Gains Most from UPS and Battery Charger Sizing

  • Those who calculate critical loads and specify UPS kVA and kW ratings
  • Those who select battery chemistry, cell count and autonomy for DC and AC systems
  • Those who witness factory and site acceptance tests before energisation
  • Those who maintain rectifiers, inverters and static bypass switches in service
  • Those who troubleshoot charger alarms, earth faults and battery string defects

Electrical departments of process plants, utilities and hospitals gain most when several engineers attend together and leave with a shared sizing method and acceptance test checklist.

UPS and Battery Charger Sizing Capabilities

Participants move from nameplate reading to defensible calculations and witnessed tests for rectifier, inverter, bypass and battery:

  • Calculate critical load profiles, power factor and crest factor — for UPS kVA rating decisions
  • Specify battery autonomy, end voltage and ageing margin — for cell count and capacity selection
  • Weigh online double-conversion, line-interactive and parallel redundant topologies — for availability targets
  • Design charger float, boost and equalise settings per chemistry — for battery life and room ventilation
  • Test transfer to static bypass, load steps and discharge performance — for acceptance sign-off
  • Apply routine inspection, impedance testing and fault isolation — for maintenance planners

Key UPS and Battery Charger Sizing Terms

  • Autonomy — the time a battery supports the rated load after mains failure before reaching its end voltage.
  • Double conversion — a UPS topology where the rectifier feeds a DC bus and the inverter continuously regenerates clean AC.
  • Static bypass — a thyristor switch that transfers the load to the raw supply on inverter overload or fault.
  • Float voltage — the constant charging voltage that holds a fully charged battery without overcharging it.
  • End-of-discharge voltage — the minimum cell voltage at which discharge stops to protect battery life.
  • Discharge capacity test — a controlled load test proving a battery delivers its rated ampere-hours.

UPS and Battery Charger Sizing Day by Day

Day 1: Critical Loads and UPS Topologies

  • Critical Load Schedules and Diversity — Setting the UPS Base Rating
  • Power Factor, Crest Factor and Harmonic Loads — Converting kW to kVA
  • Online, Line-Interactive and Offline Topologies — Matching Topology to Load Sensitivity
  • Parallel Redundant and N+1 Configurations — Choosing Availability Over Cost
  • Rectifier and Inverter Stage Ratings — Sizing for Inrush and Step Loads

Day 2: Battery and Charger Sizing

  • Lead-Acid, Nickel-Cadmium and Lithium-Ion Chemistries — Selecting Cells for Site Conditions
  • Duty Cycle Diagrams and Autonomy Calculation — Fixing Required Ampere-Hour Capacity
  • Temperature, Ageing and Design Margins — Correcting Capacity for Real Rooms
  • Industrial Charger Ratings for Recharge Time — Balancing Load and Battery Current
  • Float, Boost and Equalise Settings — Protecting Cells From Over and Undercharge

Day 3: Static Bypass, Protection and Installation

  • Static Switch and Maintenance Bypass Arrangements — Keeping Loads Alive During Service
  • Fault Current and Discrimination Downstream of the Inverter — Coordinating Breakers and Fuses
  • DC Earth Fault Monitoring on Battery Systems — Locating Insulation Defects Early
  • Battery Room Ventilation and Rack Layout — Controlling Hydrogen and Access Hazards
  • Cable Sizing for DC Links and Battery Strings — Limiting Voltage Drop

Day 4: Commissioning and Routine Testing

  • Factory and Site Acceptance Test Plans — Defining Pass Criteria Before Energisation
  • Load Bank Steps and Transfer Tests — Proving Bypass and Inverter Response
  • Discharge Capacity and Impedance Testing — Confirming Battery Health at Handover
  • Preventive Maintenance Routines for Rectifiers and Fans — Scheduling Capacitor and Filter Renewal
  • Alarm Log Reading and Fault Troubleshooting — Isolating Rectifier, Inverter or Battery Causes

Day 5: Practising the UPS and Charger Sizing and Commissioning Dossier

  • Case Load Schedule and Topology Choice — Applying Day One Ratings
  • Case Battery Autonomy and Charger Calculation — Applying Day Two Sizing
  • Case Bypass and Protection Single-Line Review — Checking Coordination and Earth Faults
  • Case Acceptance Test Sequence — Ordering Load, Transfer and Discharge Tests
  • UPS and Charger Sizing and Commissioning Dossier — Finalising Ratings, Tests and Routines

Applying UPS and Battery Charger Sizing After the Course

  • Recheck the critical load schedule and battery autonomy of one existing UPS against its present loads and cell age.
  • Draft a site acceptance test sequence with load bank steps and a discharge capacity test for the next UPS or charger replacement.

UPS and Battery Charger Sizing Questions (FAQ)

What is UPS and battery charger sizing and commissioning and why does it matter now?

It is the calculation of UPS, battery and charger ratings for a critical load and the testing that proves them before handover. It matters now because sensitive loads and new battery chemistries leave little room for guessed ratings or untested strings.

Which roles gain most from UPS and battery charger sizing and commissioning?

Electrical maintenance engineers and technicians who specify, witness tests on and maintain critical power systems gain most. Project engineers handing over new installations and planners scheduling battery testing also benefit from a shared calculation and test method.

How does UPS and battery charger sizing and commissioning differ from a UPS fault diagnosis course?

It starts earlier in the asset life. A fault diagnosis course repairs equipment already in service, while this course calculates ratings, selects batteries and chargers and proves them through acceptance tests, adding troubleshooting as one part of routine care.

What do you bring back from UPS and battery charger sizing and commissioning training?

You bring back a completed sizing and commissioning dossier for a real installation, with load schedule, autonomy and charger calculations, a protection review and an ordered acceptance test sequence you can use on your next project.

UPS and Battery Charger Sizing: The Way Forward

The UPS and Charger Sizing and Commissioning Dossier first informs whether an existing system still covers its critical load for the required autonomy. Engineers, test witnesses and maintenance planners use it at handover and at battery renewal. After its first use, the ageing and temperature margins deserve a second look against measured impedance trends from the installed strings.

Questions about dates, fees and booking

When does this course next run?

The next session runs 28 December 2026 – 1 January 2027 in Paris. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Paris, Vienna, Cairo, Milan, Manama, Barcelona, Casablanca, Abu Dhabi, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 14 – 18 February 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train