Skip to content

Upstream Asset Lifecycle and Criticality Management Training Course

Field asset owners and planners learn to rank equipment by failure consequence and cost repair, refurbish or replace choices over a field's life.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 22 – 26 November 2026 in Kuala Lumpur. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Kuala Lumpur
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

May 2027

July 2027

August 2027

September 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Upstream Asset Lifecycle and Criticality Management is a 1-week training course for asset managers, maintenance planners and upstream engineers, and it produces a ranked Asset Criticality and Lifecycle Cost Register. Ageing fields, tighter capital budgets and leaner crews now force every operator to justify each repair, overhaul and replacement. Jupiter Prime Training builds this course around those field decisions.

Why Upstream Asset Lifecycle and Criticality Management Matters Now

Three forces shape how upstream operators look after equipment today: mature reservoirs producing more water and sand that wear out pumps and valves sooner, shareholders asking for lower operating cost per barrel, and a shrinking pool of experienced technicians. An operator that ranks its equipment well spends scarce crew hours on the compressors, ESPs and export lines that actually stop production; one that ranks badly suffers avoidable deferment. The course rests on the international asset management system standards, risk-based inspection and reliability-centred maintenance (RCM) thinking.

Who Gains Most from Upstream Asset Lifecycle and Criticality Management

  • Engineers who own the equipment strategy for a field, a plant or a pipeline network
  • Planners who build the yearly maintenance and shutdown schedule from the equipment register
  • Reliability specialists who investigate repeat failures on rotating and static equipment
  • Production supervisors who weigh deferment against the cost of taking a train offline
  • Cost controllers who prepare the capital and operating budget for producing assets

Field teams gain most when the asset owner, the planner and the reliability engineer of the same facility attend together.

Upstream Asset Lifecycle and Criticality Management Capabilities

Participants turn an equipment list into a defensible ranking of where money and crew time go across a field's life.

  • Assess equipment criticality using consequence and likelihood scoring — shutdown priority decisions
  • Calculate lifecycle cost for repair, refurbish and replace options — budget holders
  • Weigh capital renewal against extra maintenance spend — field investment committees
  • Design asset performance indicators linked to deferment and uptime — operations leadership
  • Build an asset plan that ties strategy to the work order backlog — planners and contractors
  • Communicate equipment risk in plain terms — partners, auditors and finance

Key Upstream Asset Lifecycle and Criticality Management Terms

  • Criticality Ranking — an ordered score of equipment by the production, safety and environmental consequence of its failure.
  • Lifecycle Cost — the total cost of owning equipment from purchase through operation, maintenance and disposal.
  • Production Deferment — oil or gas output lost or delayed because equipment is down or running below rate.
  • Strategic Asset Management Plan — the document linking company objectives to asset decisions over a field's producing life.
  • Mean Time Between Failures — the average running time between breakdowns of a repairable item, used to forecast work.
  • Remaining Useful Life — the estimated period equipment can keep operating safely before major renewal is needed.

Upstream Asset Lifecycle and Criticality Management Day by Day

Day 1: Field Asset Context and Policy

  • Asset Management Policy — Linking Field Objectives to Equipment Decisions
  • Equipment Hierarchy and Tag Register — Defining What Is Managed
  • Field Life Stages From Plateau to Decline — Changing Asset Priorities
  • Stakeholder Map for Producing Assets — Partners, Crews and Contractors
  • International Asset Management System Standards — Shaping Internal Policy

Day 2: Criticality and Failure Consequence

  • Consequence Scoring Matrix — Ranking Production, Safety and Environmental Impact
  • Failure Modes and Effects Analysis — Locating Weak Points in Trains
  • Reliability-Centred Maintenance Logic — Choosing Task Type per Failure
  • Risk-Based Inspection Intervals — Setting Static Equipment Frequencies
  • Spares Criticality Review — Holding Stock for Long-Lead Items

Day 3: Lifecycle Cost and Renewal Options

  • Lifecycle Cost Model — Comparing Repair, Refurbish and Replace
  • Remaining Useful Life Estimation — Timing Compressor and Pump Renewal
  • Capital Versus Operating Spend Trade-Off — Budget Allocation Choices
  • Obsolescence Screening for Control Systems — Planning Upgrade Windows
  • Decommissioning Cost Outlook — Late-Life Investment Limits

Day 4: Performance Measures and Asset Plans

  • Uptime and Deferment Indicators — Tracking Production Availability
  • Mean Time Between Failures Trending — Spotting Bad Actor Equipment
  • Asset Plan Structure — Turning Strategy Into Work Packages
  • Shutdown Scope Challenge — Deciding What Enters the Turnaround
  • Asset Health Dashboard — Reporting Risk to Field Leadership

Day 5: Practising the Asset Criticality and Lifecycle Cost Register

  • Applying Consequence Scores to a Gas Compression Train — Priority Setting
  • Running Lifecycle Cost Cases on Water Injection Pumps — Renewal Timing
  • Linking Indicators to the Ranked Equipment List — Monitoring Choices
  • Peer Challenge of Ranking Assumptions — Testing Defensibility
  • Asset Criticality and Lifecycle Cost Register — Completing the Field Ranking

Applying Upstream Asset Lifecycle and Criticality Management After the Course

  • Score the twenty most production-sensitive tags on one facility with the consequence matrix and share the ranking with the planning lead.
  • Build a repair-versus-replace lifecycle cost case for one bad actor pump or compressor and present it at the next budget review.

Upstream Asset Lifecycle and Criticality Management Questions (FAQ)

What is Upstream Asset Lifecycle and Criticality Management and why does it matter now?

It is the practice of ranking field equipment by failure consequence and costing it across its whole life. It matters now because mature fields, tighter budgets and fewer experienced crews leave no room for spreading maintenance effort evenly.

Which roles gain most from Upstream Asset Lifecycle and Criticality Management?

Asset owners, maintenance planners and reliability engineers gain most. Production supervisors and cost controllers also benefit because the ranking shapes shutdown scope.

How does Upstream Asset Lifecycle and Criticality Management differ from an integrity management course?

It looks at every producing asset through cost and consequence, not only containment. An integrity course centres on corrosion, inspection and barrier assurance; this one decides where spending and crew time go across rotating, static and control equipment.

What do you bring back from Upstream Asset Lifecycle and Criticality Management?

You bring back a ranked register of field equipment with lifecycle cost cases for the highest-consequence items. It gives planners a defensible order of work.

Upstream Asset Lifecycle and Criticality Management: The Way Forward

The Asset Criticality and Lifecycle Cost Register first informs which equipment enters the next shutdown scope. Asset owners and planners use it to sequence work, and finance draws on its cost cases for renewal requests. After its first use, revisit the consequence scores as rates decline and water cut rises.

Questions about dates, fees and booking

When does this course next run?

The next session runs 22 – 26 November 2026 in Kuala Lumpur. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Kuala Lumpur, Doha, Amsterdam, Vienna, Manama, Dar es Salaam, Paris, New York, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 29 August – 2 September 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train