Atmospheric Storage Tank Design and Construction Training Course

Size shells, select roofs, agree foundations, control welding and plan hydrotests for new welded tanks, from datasheet to first fill.

This 1-week course has 25 dates from December 2026 to November 2027 in 24 cities and live online. The next session runs 6 – 10 December 2026 in Amman. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Amman
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

December 2026

January 2027

February 2027

March 2027

May 2027

June 2027

July 2027

August 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Atmospheric Storage Tank Design and Construction is a 1-week training course for mechanical and integrity engineers who specify, build and accept welded tanks, and it ends with a tank design basis and acceptance file for one new tank. Tank owners now expect a new tank to serve for decades with predictable settlement and corrosion allowance. Jupiter Prime Training delivers this design-to-handover view of atmospheric storage tanks.

Why Atmospheric Storage Tank Design and Construction Matters Now

Terminal operators are adding capacity on soft and reclaimed ground, environmental teams demand secondary containment and tight vapour control, and owners want design choices made once rather than corrected after the first internal entry. A tank designed with the right shell course thicknesses, roof type and foundation detail fills safely; one designed loosely suffers edge settlement, roof seal failure and costly early repair. The course rests on the recognised international standards for welded atmospheric tanks and for their later evaluation, described here in general terms.

Who Gains Most from Atmospheric Storage Tank Design and Construction

  • Engineers who prepare tank datasheets and check contractor shell and roof calculations
  • Integrity engineers who set corrosion allowance and the future evaluation basis
  • Civil interface engineers who approve ringwall and slab foundation details
  • Construction engineers who oversee plate erection, welding and weld examination
  • Commissioning engineers who witness hydrotests and accept tanks into service

A terminal or plant project group gains most when its design, civil and construction engineers attend together; tank quality is set at their hand-offs.

Atmospheric Storage Tank Design and Construction Capabilities

Participants move from product and site conditions to a tank that can be built, tested and handed over.

  • Calculate shell course thicknesses by the one-foot and variable-design-point methods — datasheet approval
  • Specify fixed cone, dome or floating roof types against vapour and rainfall loads — roof selection
  • Assess foundation options against soil reports and settlement predictions — civil interface sign-off
  • Apply welding procedure, sequence and examination rules to shell and bottom joints — contractor quality plans
  • Design a hydrotest plan with fill rates and settlement survey points — commissioning acceptance
  • Build a corrosion allowance and lining basis for shells and floors — integrity engineers

Key Atmospheric Storage Tank Design and Construction Terms

  • Shell course — one horizontal ring of welded plates, thicker at the bottom where hydrostatic head is greatest.
  • Annular plate — the thicker ring of bottom plates under the shell that carries concentrated shell loads.
  • Wind girder — a stiffening ring on the shell that prevents buckling of open-top or floating roof tanks.
  • Ringwall foundation — a reinforced concrete ring beneath the shell, with compacted fill supporting the bottom inside.
  • Edge settlement — downward movement of the bottom near the shell, distorting the annular plate region.
  • Frangible roof joint — a weak roof-to-shell weld that fails first under overpressure, protecting the shell-to-bottom joint.

Atmospheric Storage Tank Design and Construction Day by Day

Day 1: Service Conditions and Tank Selection

  • Product Properties and Vapour Pressure — Choosing Fixed or Floating Roof
  • Tank Sizing From Throughput and Turnover — Diameter and Height Balance
  • Site Layout, Spacing and Bunding — Containment Volume and Access Routes
  • Plate Material Selection and Toughness — Design Metal Temperature Limits
  • Tank Datasheet Structure — Information the Contractor Must Receive

Day 2: Shell, Bottom and Roof Design

  • One-Foot and Variable-Design-Point Methods — Shell Course Thickness Choice
  • Annular Plate and Bottom Slope Design — Drainage and Shell Load Path
  • Wind Girders and Seismic Overturning Checks — Shell Stability Decisions
  • Cone, Dome and Floating Roof Structures — Seal and Drain Arrangements
  • Nozzle Reinforcement and Shell Openings — Piping Load Limits

Day 3: Foundations, Welding and Erection

  • Soil Report Interpretation and Ringwall Design — Settlement Tolerance Agreement
  • Plate Erection Sequence and Jacking Methods — Shape and Roundness Control
  • Welding Procedure and Welder Qualification — Shell and Bottom Joint Quality
  • Radiography, Vacuum Box and Penetrant Tests — Construction Weld Acceptance
  • Dimensional Tolerances for Plumbness and Peaking — Contractor Punch Lists

Day 4: Testing, Protection and Handover

  • Hydrotest Fill Plan and Hold Points — Settlement Survey Readings
  • Shell and Floor Corrosion Allowance — Future Minimum Thickness Basis
  • Internal Linings and Cathodic Protection Under Floors — Bottom Life Extension
  • Venting, Overfill Protection and Grounding — Safe First Fill
  • Repair Methods Foreseen at Design Stage — Patch Plates and Bottom Replacement Access

Day 5: Practising the Tank Design Basis and Acceptance File

  • Shell Thickness Calculation for a Participant Tank — Applying Day Two Methods
  • Foundation and Settlement Criteria — Applying Day Three Soil Review
  • Hydrotest and Weld Examination Schedule — Applying Day Three and Four Rules
  • Corrosion Allowance and Protection Selection — Floor and Shell Life Targets
  • Tank Design Basis and Acceptance File — Calculations, Tests and Handover Records

Applying Atmospheric Storage Tank Design and Construction After the Course

  • Recheck the shell course thicknesses on one current tank datasheet with the variable-design-point method.
  • Draft a hydrotest hold-point and settlement survey plan for the next tank due for first fill.

Atmospheric Storage Tank Design and Construction Questions (FAQ)

What is atmospheric storage tank design and construction, and why does it matter now?

It is the engineering of welded tanks that store liquids near atmospheric pressure, from shell sizing to hydrotest. New capacity on difficult ground makes early design choices decide decades of service.

Which roles gain most from atmospheric storage tank design and construction?

Mechanical and integrity engineers gain most, joined by civil interface, construction and commissioning engineers who share the tank from datasheet to first fill.

How does atmospheric storage tank design and construction differ from a tank inspection and repair course?

It centres on new tanks: sizing, roof choice, foundations, welding and hydrotesting. An inspection and repair course starts from tanks already in service and their measured damage.

What do you bring back from atmospheric storage tank design and construction?

You bring back checked calculations, foundation and settlement criteria, a test schedule and a corrosion basis for one tank.

Atmospheric Storage Tank Design and Construction: The Way Forward

The tank design basis and acceptance file first decides whether a contractor's shell, roof and foundation proposal can be approved as offered. Design engineers use it at datasheet stage, construction engineers at erection and commissioning engineers at first fill. After the hydrotest, compare measured settlement with the agreed criteria and refine the basis for the next tank.

Questions about dates, fees and booking

When does this course next run?

The next session runs 6 – 10 December 2026 in Amman. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Amman, Madrid, Munich, Dar es Salaam, Singapore, Abu Dhabi, Sharm El-Sheikh, Rome, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 27 June – 1 July 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.