Corrosion Monitoring and Inhibitor Performance Engineering Training Course
Monitoring, inhibitor dosing and rate trend skills for corrosion and mechanical engineers who must turn coupon and probe data into integrity calls.
This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 23 – 27 November 2026 in Milan. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Milan
- Scheduled dates
- 25
- Classroom cities
- 24
- Classroom fee from
- 4,000 £
- Online fee from
- 2,900 £
When and where does this course run?
Showing 1–20 of 25 dates
November 2026
December 2026
January 2027
February 2027
March 2027
May 2027
June 2027
July 2027
August 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Corrosion Monitoring and Inhibitor Performance is a 1-week training course for corrosion and mechanical engineers who read coupon, probe and wall-thickness data and decide on inhibitor dosing, ending with a corrosion rate trend register for each system. Producers, processors and pipeline operators now carry ageing assets under tighter integrity budgets, so monitoring results must turn into clear dosing and inspection calls. Jupiter Prime Training delivers Corrosion Monitoring and Inhibitor Performance with this field focus.
Why Corrosion Monitoring and Inhibitor Performance Matters Now
Three forces shape the subject today: wells producing more water and carbon dioxide as fields mature, sour service spreading as reservoirs change, and chemical budgets questioned by finance teams who see only litres injected. An operator that links monitoring locations, inhibitor availability and measured rates can extend inspection intervals with confidence and catch a failing chemical before a leak. The course rests on mass-loss coupon practice and inhibitor availability models.
Who Gains Most from Corrosion Monitoring and Inhibitor Performance
- Engineers responsible for coupon, probe and ultrasonic monitoring locations on flowlines and trunk lines
- Specialists who select corrosion inhibitors and set injection rates for production systems
- Mechanical engineers who plan inspection intervals for piping, vessels and tank bottoms
- Chemical vendor liaison staff who review field trial results and dosing contracts
- Integrity engineers who combine cathodic protection and coating survey results with internal rate data
Asset integrity groups gain most when the monitoring engineer, the chemical specialist and the inspection planner attend together and leave with one shared reading of the rate data.
Corrosion Monitoring and Inhibitor Performance Capabilities
Participants turn coupon weights and probe signals into defensible dosing and inspection calls.
- Calculate corrosion rates from coupon mass loss and probe readings — inspection interval setting
- Assess sweet and sour corrosion threats per system — monitoring location selection
- Design inhibitor field trials with clear acceptance rates — chemical vendor selection
- Weigh inhibitor availability against measured rates — dosing rate approval
- Test coating and cathodic protection survey results against internal data — external threat ranking
- Communicate rate trends to operations and finance — chemical budget defence
Key Corrosion Monitoring and Inhibitor Performance Terms
- Mass-loss coupon — a weighed metal sample exposed in the process stream, then cleaned and reweighed to give an average corrosion rate.
- Electrical resistance probe — a sensor whose element resistance rises as metal is lost, giving near-continuous rate readings.
- Inhibitor availability — the share of operating time that the inhibitor is injected at or above its target dose.
- Sweet corrosion — metal loss driven by dissolved carbon dioxide forming carbonic acid in produced water.
- Sour corrosion — attack linked to hydrogen sulphide, including pitting and hydrogen-related cracking of susceptible steels.
- Residual inhibitor concentration — the measured inhibitor level downstream of injection, used to confirm the chemical reaches the pipe wall.
Corrosion Monitoring and Inhibitor Performance Day by Day
Day 1: Corrosion Threats in Production and Transport
- Carbon Dioxide Corrosion Mechanisms — Threat Ranking for Wet Gas Lines
- Hydrogen Sulphide Attack and Cracking Modes — Sour Service Material Choices
- Water Cut and Flow Regime Effects — Where Water Wets the Pipe
- Microbial Corrosion Indicators — Biocide Need in Injection Systems
- Corrosion Circuit Mapping — Grouping Pipework by Shared Threat
Day 2: Monitoring Methods and Locations
- Mass-Loss Coupon Handling and Cleaning — Reliable Average Rate Figures
- Electrical Resistance and Linear Polarisation Probes — Choosing Response Speed
- Ultrasonic Thickness Grids and Mapping — Confirming Wall Loss in Place
- Access Fitting Placement at Bottom of Line — Catching Worst-Case Rates
- Monitoring Location Selection Matrix — Spending Points Where Risk Sits
Day 3: Inhibitor Selection and Dosing
- Film-Forming Inhibitor Chemistry — Matching Product to Fluid Conditions
- Laboratory Bubble and Wheel Tests — Screening Candidate Products
- Continuous and Batch Injection Methods — Line Length and Access Limits
- Residual Concentration Sampling — Proving Chemical Reaches the Wall
- Inhibitor Availability Model — Dosing Rate Approval and Downtime Allowance
Day 4: External Protection and Integrity Calls
- Coating Condition Surveys and Holiday Detection — External Threat Ranking
- Cathodic Protection Potential Readings — Adequacy of Buried Line Protection
- Corrosion Rate Statistics and Trend Fitting — Separating Noise From Change
- Remaining Life Estimates From Rate Data — Inspection Interval Setting
- Key Performance Indicators for Chemical Treatment — Budget Defence to Finance
Day 5: Practising the Corrosion Rate Trend Register
- Threat Ranking Exercise on a Gas Gathering Network — Applying Mechanism Knowledge
- Coupon and Probe Data Interpretation Case — Applying Monitoring Methods
- Inhibitor Field Trial Evaluation — Applying Dosing and Residual Results
- Water Injection Line Case From a Utilities Plant — Cross-Sector Comparison
- Corrosion Rate Trend Register — Completing Each System's Rate and Action Record
Applying Corrosion Monitoring and Inhibitor Performance After the Course
- Review every coupon and probe location against the selection matrix and move points that miss bottom-of-line water.
- Calculate inhibitor availability for the past quarter on one system and set a residual sampling routine.
Corrosion Monitoring and Inhibitor Performance Questions (FAQ)
What is corrosion monitoring and inhibitor performance, and why does it matter now?
It is the practice of measuring internal metal loss and proving that injected chemicals control it. It matters now because maturing fields produce more water and carbon dioxide, so rate data must justify both chemical spend and inspection intervals.
Which roles gain most from corrosion monitoring and inhibitor performance?
Corrosion and mechanical engineers gain most. Monitoring, chemical treatment and inspection staff share one method for agreeing dosing changes.
How does corrosion monitoring and inhibitor performance differ from a corrosion management systems course?
It works at field data level rather than at policy level. A management systems course sets roles, risk rankings and audits, while this one teaches you to read coupons, probes and residuals and turn them into dosing and inspection calls.
What do you bring back from corrosion monitoring and inhibitor performance?
You bring back a trend register for your own systems. It records threats, monitoring points, measured rates, inhibitor availability and the next action.
Corrosion Monitoring and Inhibitor Performance: The Way Forward
The corrosion rate trend register first informs whether each system's inhibitor dose holds, rises or falls. Corrosion engineers own it, inspection planners use it to set intervals, and operations use it to protect injection uptime. After the first quarter of use, revisit monitoring locations: the register often shows that some points never see free water and should move.
Find more Petroleum Engineering & Oil and Gas Operations Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 23 – 27 November 2026 in Milan. It is one of 25 dates scheduled up to November 2027.
Where is this course held?
In a classroom in 24 cities: Milan, Dar es Salaam, Sharm El-Sheikh, Kuala Lumpur, Casablanca, Geneva, Madrid, Dubai, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. One date is scheduled as a live online session: 6 – 10 June 2027, from 2,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.