Skip to content

Decommissioning of Offshore Installations Training Course

Plan well plugging, topsides and jacket removal, heavy-lift vessels and marine logistics for late-life offshore platforms.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 23 – 27 November 2026 in Madrid. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Madrid
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

July 2027

August 2027

September 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Decommissioning of Offshore Installations is a 1-week training course for offshore operations and late-life asset teams who build a removal execution plan covering wells, topsides, jackets and the vessels that carry them ashore. Ageing platforms, tighter environmental expectations and costly heavy-lift vessel markets now make the end of field life a major capital event. Jupiter Prime Training delivers this course on Decommissioning of Offshore Installations.

Why Decommissioning of Offshore Installations Matters Now

Three forces shape offshore removal today. Many platforms are passing their design life while production falls, so cessation of production arrives sooner than budgets assumed. Owners, partners and coastal communities expect seabed restoration and clear evidence that wells stay sealed permanently. Heavy-lift and diving vessel capacity is scarce and booked years ahead, so a late decision raises cost sharply. Good sequencing cuts idle vessel days; drift brings repeated mobilisations. The course rests on recognised offshore engineering practice, permanent well barrier principles and waste hierarchy thinking.

Who Gains Most from Decommissioning of Offshore Installations

  • Late-life asset leads who decide cessation timing and removal scope
  • Well engineers responsible for plug and abandonment design and barrier verification
  • Structural and lifting engineers who assess topsides and jacket removal methods
  • Marine and logistics coordinators who plan vessel spreads, transport and onshore receipt
  • Cost and contracts specialists who estimate, track and allocate removal spend

A late-life asset group that sends its well, structural and marine members together gains most.

Decommissioning of Offshore Installations Capabilities

Participants move from field cessation to the last lift, linking well, structure and vessel choices into one removal sequence.

  • Assess cessation of production options and late-life inventory — asset owners and partners
  • Design a plug and abandonment campaign with verified permanent barriers — well integrity sign-off
  • Weigh single-lift, reverse-installation and piece-small removal methods — structural method selection
  • Specify heavy-lift vessel, barge and quayside requirements — marine contracting decisions
  • Calculate a decommissioning cost estimate with contingency ranges — partner budget approval
  • Build a removal execution plan with interfaces and hold points — offshore and onshore crews

Key Decommissioning of Offshore Installations Terms

  • Cessation of production — the point at which a field permanently stops producing hydrocarbons and the removal phase formally begins.
  • Plug and abandonment — placing permanent cement and mechanical barriers in a well so that reservoir fluids can never reach surface or seabed.
  • Topsides — the deck modules above the waterline holding process, utilities and accommodation equipment.
  • Jacket — the steel lattice substructure piled to the seabed that supports the topsides.
  • Piece-small removal — dismantling a structure offshore into small sections lifted by platform cranes.
  • Engineering down and cleaning — isolating, flushing and making safe process systems before cutting.

Decommissioning of Offshore Installations Day by Day

Day 1: Late-Life Context and Removal Strategy

  • Cessation of Production Screening — Timing the End of Field Life
  • Late-Life Asset Inventory Survey — Scoping Structures, Wells and Pipelines
  • Comparative Assessment of Removal Options — Choosing Full or Partial Removal
  • Stakeholder and Partner Mapping — Aligning Owners on Removal Obligations
  • Decommissioning Phase Gate Model — Setting Approval Points for Each Stage

Day 2: Well Plugging and Abandonment

  • Permanent Barrier Envelope Design — Sealing Reservoirs for the Long Term
  • Rigless and Rig-Based Abandonment Methods — Selecting the Plugging Spread
  • Casing Cutting and Conductor Recovery — Clearing the Wellhead Area
  • Barrier Verification and Logging — Proving Seal Quality Before Sign-Off
  • Multi-Well Campaign Sequencing — Reducing Mobilisations Across a Platform

Day 3: Topsides Preparation and Removal Methods

  • Engineering Down and Cleaning Procedures — Making Process Modules Safe to Cut
  • Hazardous Material Surveys — Handling Asbestos, NORM and Residual Fluids
  • Single-Lift Versus Reverse-Installation Removal — Matching Method to Deck Weight
  • Piece-Small Dismantling Plans — Using Platform Cranes for Small Sections
  • Lift Engineering and Rigging Studies — Confirming Centre of Gravity and Sling Loads

Day 4: Jackets, Heavy-Lift and Marine Logistics

  • Jacket Cutting Below Mudline — Choosing Abrasive, Diamond Wire or Internal Cutters
  • Heavy-Lift Vessel and Barge Selection — Balancing Capacity, Weather and Availability
  • Sea Fastening and Transport Analysis — Securing Loads for Tow to Shore
  • Quayside Receipt and Dismantling Yard — Planning Onshore Handling and Reuse
  • Seabed Clearance and Debris Survey — Confirming the Site Is Left Clear

Day 5: Practising the Removal Execution Plan

  • Decommissioning Cost Estimate and Contingency — Applying Day 1 to Day 4 Scope
  • Integrated Removal Schedule — Linking Plugging, Preparation and Lifting Windows
  • Contracting Strategy for Removal Scopes — Packaging Wells, Lifting and Disposal
  • Close-Out Reporting and Liability Records — Documenting Residual Obligations
  • Removal Execution Plan Presentation — Completing the Plan for Partner Approval

Applying Decommissioning of Offshore Installations After the Course

  • Run a comparative assessment of removal options for one late-life platform and present the preferred method with cost ranges.
  • Draft a multi-well plug and abandonment sequence that shares one plugging spread across a platform's wells.

Decommissioning of Offshore Installations Questions (FAQ)

What is Decommissioning of Offshore Installations and why does it matter now?

Decommissioning of Offshore Installations is the planned plugging of wells and removal of platforms at the end of field life. It matters now because many structures are ageing together, vessel capacity is scarce and owners must close residual liabilities with clear records.

Which roles gain most from Decommissioning of Offshore Installations training?

Late-life asset leads, well engineers, structural and lifting engineers, marine coordinators and cost specialists gain most. Each owns part of the removal sequence.

How does Decommissioning of Offshore Installations differ from onshore plant decommissioning courses?

Decommissioning of Offshore Installations focuses on marine work: well plugging from platforms, topsides and jacket lifts, heavy-lift vessels and tow to shore. Onshore plant decommissioning deals with land-based structures, demolition and site restoration.

What do you bring back from Decommissioning of Offshore Installations training?

You bring back a removal execution plan for a sample platform, with a plugging sequence, a removal method choice, a vessel and logistics outline and a cost estimate with contingency ranges.

Decommissioning of Offshore Installations: The Way Forward

The removal execution plan sets out wells, topsides, jacket and vessel scopes in one sequence. Its first use is the decision on removal method and vessel booking by asset leads and partners. After the first campaign, revisit the cost contingency and the piece-small versus single-lift choice, since actual vessel days and weather downtime will reshape both assumptions.

Questions about dates, fees and booking

When does this course next run?

The next session runs 23 – 27 November 2026 in Madrid. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Madrid, New York, Amman, Casablanca, Amsterdam, Milan, Muscat, Paris, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 31 January – 4 February 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train