Skip to content

Field Building Blast Retrofit Assessment Training Course

Engineers, owners and project teams judge whether ageing occupied field buildings can resist revised explosion loads and how to upgrade them.

This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 23 – 27 November 2026 in Casablanca. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.

See dates and book Download brochure (PDF) Training for your team

Duration
1 Week
Next start
Casablanca
Scheduled dates
25
Classroom cities
24
Classroom fee from
4,000 £
Online fee from
2,900 £

When and where does this course run?

Showing 1–20 of 25 dates

November 2026

December 2026

January 2027

February 2027

March 2027

May 2027

June 2027

July 2027

August 2027

September 2027

Can’t find a suitable date? Tell us what you need.

What does this course cover?

Field Building Blast Retrofit Assessment is a 1-week training course for structural and facility siting engineers deciding whether ageing occupied field buildings stay, are strengthened or are vacated; it produces a Retrofit Scoping Dossier for one existing building. Many field buildings predate current explosion studies, leaving owners with upgrade choices and thin as-built records. Jupiter Prime Training offers this course on Field Building Blast Retrofit Assessment.

Why Field Building Blast Retrofit Assessment Matters Now

Three pressures meet on older fields: updated consequence studies that raise predicted overpressure at existing control rooms and maintenance sheds, life extension of facilities well beyond their original design life, and workforce expectations that occupied buildings protect people as well as new ones do. An operator that judges retrofit soundly spends upgrade money where occupant vulnerability is highest; a poor judgement over-strengthens low-risk huts or leaves crowded masonry rooms exposed. The course rests on the industry recommended practice for siting permanent plant buildings and on single-degree-of-freedom (SDOF) response methods.

Who Gains Most from Field Building Blast Retrofit Assessment

  • Engineers responsible for checking the capacity of existing walls, roofs and frames against revised explosion loads
  • Specialists responsible for building siting evaluations and occupant vulnerability screening
  • Engineers responsible for life extension studies of ageing field infrastructure
  • Staff responsible for scoping and estimating structural upgrade projects
  • Engineers responsible for control room and substation modifications

Asset integrity groups that send a structural engineer together with a siting specialist gain most, because retrofit verdicts depend on both load and occupancy judgements.

Field Building Blast Retrofit Assessment Capabilities

Participants move from an uncertain as-built record to a defensible verdict on strengthening, relocation or reduced occupancy.

  • Assess existing construction from surveys and drawings — the asset owner deciding whether further investigation is justified
  • Calculate reflected overpressure and impulse on building faces — the structural checks that follow
  • Apply SDOF response charts to existing members — the retrofit priority list
  • Weigh strengthening against relocation and occupancy reduction — the facility manager approving the option
  • Specify upgrade details for doors, cladding and connections — the contractor executing the modification
  • Communicate residual vulnerability to operations leaders — the decision to keep a building occupied

Key Field Building Blast Retrofit Assessment Terms

  • Vapour cloud explosion — Ignition of a flammable gas cloud in a congested area, sending a pressure wave towards nearby buildings.
  • Reflected overpressure — The amplified pressure on a building face that directly meets the blast wave.
  • Building damage level — A graded scale of structural damage, from minor cracking to collapse.
  • Ductility ratio — The ratio of peak member deflection to its elastic limit, used to compare response with acceptance criteria.
  • Occupant vulnerability — The likelihood that people inside a building are harmed by its structural response or debris.
  • Retrofit scheme — A set of strengthening, shielding or replacement measures that lowers the damage level of an existing building.

Field Building Blast Retrofit Assessment Day by Day

Day 1: Existing Buildings Under Revised Explosion Studies

  • Consequence Study Updates — Which Existing Buildings Need Re-Examination
  • Siting Occupancy Criteria — Screening Buildings In or Out
  • As-Built Record Gaps — Planning Intrusive Surveys and Coring
  • Construction Type Classification — Masonry, Precast, Steel Frame Response Expectations
  • Life Extension Context — Linking Retrofit Spend to Remaining Asset Life

Day 2: Deriving Loads on Older Structures

  • Congestion and Confinement Mapping — Selecting Credible Explosion Sources
  • Side-On and Reflected Pressure — Face Loads for Each Elevation
  • Positive Phase Duration and Impulse — Impulsive Versus Quasi-Static Regimes
  • Roof and Rear Wall Loading — Clearing Effects on Low Buildings
  • Load Uncertainty Bands — Sensitivity of Verdicts to Study Assumptions

Day 3: Checking Capacity of Existing Members

  • SDOF Idealisation of Walls — Resistance Functions From Actual Reinforcement
  • Pressure-Impulse Diagrams — Rapid Screening of Wall Panels
  • Connection and Anchorage Checks — Weak Links in Older Construction
  • Door, Window and Penetration Review — Debris Hazards to Occupants
  • Damage Level Assignment — Translating Response Into Occupant Vulnerability

Day 4: Choosing Retrofit Options

  • Steel Liner and Stud Strengthening — Upgrading Masonry Infill Walls
  • Fibre-Reinforced Polymer Overlays — Limits for Cracked Concrete Panels
  • Blast Walls and Shielding — Protecting Buildings Without Internal Disruption
  • Occupancy Reduction and Relocation — Alternatives to Structural Upgrade
  • Option Ranking Matrix — Cost, Shutdown Impact and Vulnerability Reduction

Day 5: Practising the Retrofit Scoping Dossier

  • Control Room Case Load Derivation — Applying Elevation Pressures
  • Wall and Roof Capacity Verdicts — Applying SDOF Checks
  • Preferred Upgrade Selection — Applying the Option Ranking Matrix
  • Peer Challenge of Assumptions — Testing Verdicts Before Approval
  • Retrofit Scoping Dossier — Completing Findings, Options and Next Steps

Applying Field Building Blast Retrofit Assessment After the Course

  • Lead a screening of one occupied field building, assigning a damage level from SDOF checks on its weakest wall and roof members.
  • Run an option ranking session comparing strengthening, shielding and occupancy reduction for a building flagged by the latest explosion study.

Field Building Blast Retrofit Assessment Questions (FAQ)

What is Field Building Blast Retrofit Assessment and why does it matter now?

It is the process of judging whether an existing occupied field building can resist predicted explosion loads and how to upgrade it. It matters now because revised consequence studies and life extension projects are exposing older buildings designed without blast loads.

Which roles gain most from Field Building Blast Retrofit Assessment?

Structural engineers and building siting specialists gain most. Life extension and upgrade scoping engineers also benefit when turning damage level verdicts into funded modifications.

How does Field Building Blast Retrofit Assessment differ from blast-resistant design of new buildings?

It starts from what already stands. You work with incomplete drawings, actual reinforcement and ageing connections, and you compare structural upgrades with relocation or reduced occupancy instead of sizing members from scratch.

What do you bring back from Field Building Blast Retrofit Assessment?

You bring back a scoping dossier for one existing building: derived loads, member verdicts, a damage level and ranked retrofit options for your asset owner.

Field Building Blast Retrofit Assessment: The Way Forward

The Retrofit Scoping Dossier first informs whether a flagged building stays occupied while upgrades are designed. Asset owners, facility managers and project engineers use it to approve funding and shutdown windows. After its first use, revisit the load assumptions whenever the explosion study or plant layout changes.

Questions about dates, fees and booking

When does this course next run?

The next session runs 23 – 27 November 2026 in Casablanca. It is one of 25 dates scheduled up to November 2027.

Where is this course held?

In a classroom in 24 cities: Casablanca, Amman, London, Sharm El-Sheikh, Abu Dhabi, Amsterdam, Munich, Rome, and more. It is also scheduled as live online sessions.

Can I attend this course online?

Yes. One date is scheduled as a live online session: 7 – 11 November 2027, from 2,900 £ per participant.

How long is the course?

1 Week. Each date shows its start and end dates.

How much does the course cost?

Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.

Is there a brochure for this course?

How do I book a place?

Choose a date above and select Register, or send us an enquiry.

Can this course be run for our team?

Yes. Tell us the number of participants and your preferred dates and city through our training request form.

More ways to train