Pipe Rack Concrete Deterioration and Strengthening Training Course
Trace cracks and spalling on plant pipe racks and foundations to their cause, then select jacketing, FRP wrapping or mortar repairs that work on live units.
This 1-week course has 25 dates from November 2026 to October 2027 in 24 cities and live online. The next session runs 30 November – 4 December 2026 in Casablanca. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Casablanca
- Scheduled dates
- 25
- Classroom cities
- 24
- Classroom fee from
- 4,000 £
- Online fee from
- 2,900 £
When and where does this course run?
Showing 1–20 of 25 dates
November 2026
December 2026
January 2027
February 2027
March 2027
April 2027
May 2027
June 2027
July 2027
August 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Pipe Rack Concrete Deterioration and Strengthening is a 1-week training course for civil and structural engineers who look after pipe racks, equipment plinths and foundations at process plants, and it ends with a pipe rack strengthening schedule for one unit. Racks carry live pipework and cable trays, so damaged members cannot simply be taken out of service. Jupiter Prime Training runs this course for engineers repairing concrete on running plant.
Why Pipe Rack Concrete Deterioration and Strengthening Matters Now
Three pressures meet on plant concrete today. Many racks built for an original pipe layout now carry extra lines, heavier valves and new cable routes, so members work closer to their capacity than first intended. Coastal air, cooling tower drift and sulphate-bearing ground water attack cover and bars together. Shutdown windows are also shorter, pushing owners towards strengthening methods that can be installed with lines live. Sites that diagnose the mechanism choose a lasting fix; sites that patch symptoms see cracks return.
Who Gains Most from Pipe Rack Concrete Deterioration and Strengthening
- Engineers responsible for pipe rack and sleeper condition across process units
- Engineers responsible for compressor, pump and vessel foundation integrity
- Engineers responsible for scoping concrete repairs in shutdown work packs
- Engineers responsible for checking added loads from new lines and cable trays
- Engineers responsible for supervising repair contractors on live plant
A site civil group that sends its inspection engineer and its repair scoping engineer together gains most, since diagnosis and repair choice then align.
Pipe Rack Concrete Deterioration and Strengthening Capabilities
Participants trace each crack or stain to its mechanism and match a durable repair.
- Assess chloride, carbonation and sulphate damage from cores and cover surveys — repair scope decisions
- Distinguish alkali-silica reaction and freeze-thaw cracking from load cracking — structural engineers signing off members
- Calculate residual capacity of corroded columns and beams — owners deciding on load limits
- Specify concrete jacketing, FRP wrapping and repair mortars for each defect — repair contractors
- Design temporary supports and live-line sequencing for rack repairs — operations supervisors
- Communicate repair priorities and remaining life to plant managers — shutdown planners
Key Pipe Rack Concrete Deterioration and Strengthening Terms
- Chloride threshold — the chloride level at the bar surface above which steel starts to corrode.
- Carbonation front — the depth to which carbon dioxide has lowered concrete alkalinity, leaving reinforcement unprotected once it reaches the bars.
- Alkali-silica reaction — a swelling gel formed between reactive aggregate and cement alkalis that produces map cracking and expansion.
- Concrete jacketing — encasing a damaged column or beam in new reinforced concrete to restore section and add capacity.
- FRP wrapping — bonding fibre-reinforced polymer sheets to confine a member or add flexural and shear strength.
- Half-cell potential mapping — surface electrical readings showing where reinforcement is likely corroding.
Pipe Rack Concrete Deterioration and Strengthening Day by Day
Day 1: Plant Concrete Under Attack
- Pipe Rack and Foundation Load Paths — Locating Members With Least Reserve
- Reinforcement Corrosion Mechanisms — Linking Spalling to Chloride and Carbonation
- Sulphate and Acid Attack From Ground and Spills — Judging Section Loss
- Alkali-Silica Reaction Signs — Separating Expansion From Structural Cracking
- Freeze-Thaw and Thermal Cycling Damage — Recognising Surface Scaling Patterns
Day 2: Condition Assessment Methods
- Visual Defect Mapping on Racks — Recording Cracks, Staining and Delamination
- Cover Meter and Half-Cell Surveys — Locating Active Corrosion Zones
- Core Testing and Chloride Profiles — Estimating Time to Further Corrosion
- Rebound Hammer and Ultrasonic Pulse Velocity — Comparing Concrete Quality Across Members
- Condition Rating Systems — Ranking Bays and Foundations for Intervention
Day 3: Residual Capacity and Repair Choice
- Section Loss Calculation for Corroded Bars — Setting Interim Load Limits
- Added Pipe and Tray Loads — Checking Members Against New Demand
- Patch Repair With Polymer-Modified Mortars — Avoiding Incipient Anode Corrosion
- Corrosion Inhibitors and Protective Coatings — Extending Life of Sound Concrete
- Repair Option Matrix — Matching Each Mechanism to a Durable Method
Day 4: Strengthening Design and Live-Plant Execution
- Concrete and Steel Jacketing of Columns — Restoring Section and Axial Capacity
- FRP Wrapping and Laminates — Adding Confinement, Flexure and Shear Strength
- Foundation Underpinning and Plinth Recasting — Supporting Rotating Equipment Bases
- Temporary Shoring Under Live Pipework — Sequencing Breakout Without Shutdown
- Repair Quality Checks — Testing Bond, Cover and Cure on Site
Day 5: Practising the Pipe Rack Strengthening Schedule
- Case Rack Survey Interpretation — Applying Assessment Results to Each Bay
- Capacity Check of Worst Members — Applying Residual Strength Calculations
- Method Selection per Defect — Applying the Repair Option Matrix
- Shutdown and Live-Line Phasing — Aligning Repairs With Operations Windows
- Pipe Rack Strengthening Schedule — Presenting Priorities and Methods to Owners
Applying Pipe Rack Concrete Deterioration and Strengthening After the Course
- Run a half-cell and cover survey on the oldest rack bay and rank its members by corrosion activity.
- Check one rack carrying recently added lines for residual capacity, setting interim load limits.
Pipe Rack Concrete Deterioration and Strengthening Questions (FAQ)
What is pipe rack concrete deterioration and strengthening, and why does it matter now?
It is diagnosing damage in plant racks and foundations and designing repairs that restore capacity. It matters now because racks carry more pipework than designed while shutdown windows for repair keep shrinking.
Which roles gain most from pipe rack concrete deterioration and strengthening skills?
Civil and structural engineers at process plants gain most. Those who inspect racks, scope shutdown repairs or supervise contractors apply the methods immediately.
How does a pipe rack concrete deterioration and strengthening course differ from a general concrete repair course?
It works on structures that must stay loaded during repair. A general course covers buildings and bridges; this one adds live-line shoring, added pipe loads and foundation work under rotating equipment.
What do you bring back from pipe rack concrete deterioration and strengthening training?
You bring back a strengthening schedule for one real rack or foundation group, listing each defect, its mechanism, method and phasing.
Pipe Rack Concrete Deterioration and Strengthening: The Way Forward
The pipe rack strengthening schedule first informs which bays are repaired in the next shutdown and which can be strengthened with lines live. Civil engineers and shutdown planners rely on it. Once the first jackets or wraps are in place, the chloride and half-cell results deserve a fresh look, since repairs shift where corrosion spreads.
Find more Petroleum Engineering & Oil and Gas Operations Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 30 November – 4 December 2026 in Casablanca. It is one of 25 dates scheduled up to October 2027.
Where is this course held?
In a classroom in 24 cities: Casablanca, London, Doha, Munich, Rome, Paris, Dubai, Kuala Lumpur, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. One date is scheduled as a live online session: 30 May – 3 June 2027, from 2,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.