Refractory Installation Quality Control and Acceptance Training Course
Control anchors, castable batches, brick joints and fibre modules with hold points and clear acceptance criteria, built for inspectors and turnaround planners.
This 1-week course has 25 dates from November 2026 to November 2027 in 24 cities and live online. The next session runs 23 – 27 November 2026 in Madrid. Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online.
See dates and book Download brochure (PDF) Training for your team
- Duration
- 1 Week
- Next start
- Madrid
- Scheduled dates
- 25
- Classroom cities
- 24
- Classroom fee from
- 4,000 £
- Online fee from
- 2,900 £
When and where does this course run?
Showing 1–20 of 25 dates
November 2026
December 2026
January 2027
February 2027
March 2027
May 2027
June 2027
July 2027
August 2027
September 2027
Can’t find a suitable date? Tell us what you need.
What does this course cover?
Refractory Installation Quality Control and Acceptance is a 1-week training course for inspection engineers and turnaround planners who must sign off castable, brick and ceramic fibre linings, with each participant completing a lining inspection and test plan. Refractory faults found after start-up cost far more than faults stopped at a hold point, so acceptance discipline now decides turnaround outcomes. Jupiter Prime Training presents refractory installation quality control as an inspection discipline.
Why Refractory Installation Quality Control Matters Now
Three forces shape refractory installation quality control today. Turnaround windows keep shrinking, so linings are installed by large contractor crews under schedule pressure. Experienced refractory inspectors are scarce. And plant owners increasingly expect documented evidence that every anchor, joint and placement meets the specification before a unit is boxed up. Controlling installation through hold points and witnessed tests avoids early hot spots and repeat shutdowns; accepting linings on trust invites them. The course rests on the inspection and test plan (ITP) approach.
Who Gains Most from Refractory Installation Quality Control
- Inspection engineers who witness placement and release hold points on lined equipment
- Turnaround planners who sequence refractory scopes, curing time and inspection access
- Quality control coordinators who keep contractor records, test reports and non-conformance logs
- Maintenance engineers who own heaters, reformers, kilns and boilers between outages
- Contract engineers who write acceptance terms into refractory installation scopes
Plant inspection departments gain most when an inspector, a planner and a contract engineer attend together and agree one set of acceptance rules.
Refractory Installation Quality Control Capabilities
Participants move from reading a lining specification to controlling its installation with evidence at every hold point.
- Specify hold, witness and review points in a lining ITP — turnaround schedule owners
- Assess anchor layout, welding and coating before placement — release of the anchor hold point
- Test castable mixing water, flow and sample panels on site — contractor acceptance
- Weigh brick joint, expansion allowance and ceramic fibre module defects against criteria — repair or accept decisions
- Record non-conformances and concessions in a traceable form — plant owners and auditors
- Build an acceptance dossier for each lined item — handover to operations
Key Refractory Installation Quality Control Terms
- Inspection and test plan (ITP) — a document listing each installation activity, its check, acceptance criterion, record and the party who must witness it.
- Hold point — a stage beyond which work may not continue until the named inspector has checked and released it.
- Witness point — a stage the inspector is invited to observe, where work may proceed if the inspector does not attend.
- Sample panel — a test piece cast alongside the lining from the same batch, later cut or tested to confirm properties.
- Anchor pull test — a load applied to selected welded anchors to confirm the weld holds before refractory placement.
- Non-conformance report — a record of a defect against the specification, with its disposition: repair, replace or accept by concession.
Refractory Installation Quality Control Day by Day
Day 1: Lining Scopes and Acceptance Context
- Castable, Brick and Ceramic Fibre Systems — Matching Inspection Effort to Lining Type
- Lining Specifications and Datasheets — What the Inspector Must Verify
- Turnaround Refractory Scopes — Sequencing Installation, Curing and Inspection Access
- Roles of Owner, Contractor and Third-Party Inspector — Who Releases Each Stage
- Common Installation Failure Modes — Where Early Hot Spots Begin
Day 2: Building the Inspection and Test Plan
- ITP Structure and Activity Breakdown — Setting Checks for Every Stage
- Hold, Witness and Review Points — Balancing Control Against Schedule
- Acceptance Criteria and Tolerances — Turning Specifications into Measurable Checks
- Material Receipt and Storage Checks — Shelf Life, Moisture and Batch Traceability
- Contractor Procedure Review — Approving Method Statements Before Mobilisation
Day 3: Anchoring and Monolithic Placement Control
- Anchor Layout, Welding and Coating Checks — Releasing the Anchor Hold Point
- Anchor Pull and Hammer Tests — Sampling Rate and Rejection Rules
- Castable Mixing, Water Ratio and Flow Tests — Accepting Each Batch
- Gunning and Pouring Observation — Rebound, Lamination and Void Risks
- Sample Panels and Thickness Checks — Evidence for Final Acceptance
Day 4: Brick, Fibre and Post-Installation Inspection
- Brick Laying Joints and Expansion Allowances — Accept or Rebuild Decisions
- Ceramic Fibre Module and Blanket Installation — Compression and Gap Criteria
- Visual, Sounding and Dimensional Inspection — Finding Defects Before Box-Up
- Curing and Heat-Up Records — Confirming the Schedule Was Followed
- Non-Conformance Reports and Concessions — Repair, Replace or Accept
Day 5: Practising the Lining Inspection and Test Plan
- Case Review of a Heater Relining — Applying Hold Point Selection
- Defect Photograph Exercise — Applying Acceptance Criteria to Real Findings
- Batch Record Audit — Applying Traceability and Test Evidence Checks
- Acceptance Dossier Assembly — Handover Records for Operations
- Lining Inspection and Test Plan — Completing the Participant's Own ITP
Applying Refractory Installation Quality Control After the Course
- Review the ITP for the next refractory scope and add missing hold points for anchors, batches and sample panels.
- Run a short briefing with the installation contractor on acceptance criteria and non-conformance reporting before mobilisation.
Refractory Installation Quality Control Questions (FAQ)
What is refractory installation quality control and why does it matter now?
Refractory installation quality control is the planned checking of anchors, materials and placement while a lining is built. It matters now because defects found after start-up force costly repeat shutdowns.
Which roles gain most from refractory installation quality control training?
Inspection engineers and turnaround planners gain most. Quality control coordinators and contract engineers who define acceptance terms also benefit.
How does refractory installation quality control differ from a refractory materials or hot repair course?
It focuses on controlling new installation and accepting it, not on choosing materials or repairing linings in service.
What do you bring back from refractory installation quality control training?
You bring back a lining inspection and test plan for one of your own units. It sets hold points, witness points, acceptance criteria and records.
Refractory Installation Quality Control: The Way Forward
The lining inspection and test plan is the first tool to use when the next refractory scope is issued. It informs which stages need a hold point and how much inspector time the turnaround must reserve. Inspectors, planners and contractors all work from it. After its first use, revisit the sampling rates and acceptance criteria against the defects actually found.
Find more Maintenance, Reliability & Asset Integrity Training Courses by city
Questions about dates, fees and booking
When does this course next run?
The next session runs 23 – 27 November 2026 in Madrid. It is one of 25 dates scheduled up to November 2027.
Where is this course held?
In a classroom in 24 cities: Madrid, New York, Rome, Muscat, Dar es Salaam, Kuala Lumpur, Manama, Amman, and more. It is also scheduled as live online sessions.
Can I attend this course online?
Yes. One date is scheduled as a live online session: 20 – 24 June 2027, from 2,900 £ per participant.
How long is the course?
1 Week. Each date shows its start and end dates.
How much does the course cost?
Fees per participant run from 4,000 £ (Cairo) to 9,500 £ (New York) in a classroom, and from 2,900 £ live online. Each date shows its own fee.
Is there a brochure for this course?
How do I book a place?
Choose a date above and select Register, or send us an enquiry.
Can this course be run for our team?
Yes. Tell us the number of participants and your preferred dates and city through our training request form.